
US-501 operation manual
US-501 R02 13.07.09 Display version 4, PLC version 4
P.14 of 31
> Preparation for Installation
Installation must be carried out by authorized personnel. Follow the steps below:
1.
Position the machine on a flat surface and allow at least 50cm clearance on both sides as well as
the back side, this is essential to allow enough room for carrying out necessary service and
maintenance
2.
Cut loose all packing cable ties and materials in order to free up all machine movements.
3.
Connect the power plug to a suitable outlet with at least 15A capacity.
4.
Make sure there is enough lubricate oil in the sewing machine. Oil may be drained at the time of
shipping.
5.
Prepare some fabric for testing
6.
The machine is now ready for operation.