HAMWORTHY HEATING LTD 

 

WESSEX-HE 200 BOILER 

 

500001008/K 

(unvented) Hot Water System. 
In order to correctly size a Pressurisation Unit for any 
Heating System certain parameters are required.   
These are: - 
1) Static height of highest component in system. 
2) System volume - if not known a general rule of 
thumb of 10litres/kW installed boiler power can be 
used. 
3) Maximum flow temperature, i.e. most systems run 
at 82°C. 
4) Maximum system hot working pressure, generally 
given in bar gauge. 
 
From the above information Hamworthy Heating can 
size the pressurisation unit and also the expansion 
vessel required. 
 
Care must be taken in sizing expansion vessels to 
ensure maximum acceptance factors are not 
exceeded.  Normally manufacturers of vessels 
impose a limit of 0.5.  This value must not be 
exceeded at any time during the operation of the 
boiler: this includes the over pressure condition 
should a safety valve lift.  
 
Consideration should also be given to sizing of the 
safety valve(s) in the system.   See 

BS 6759 Part 1 

(ISO 4126) 

and

 BS 6644

.   

 
See also 

BS 6880 Part 1 

for design considerations. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

9.0 ELECTRICAL SUPPLY

 

 
See 

BS 6644

 

WARNING:  THIS APPLIANCE MUST BE 
EARTHED. 
     

Wiring external to the boiler must be installed in 
accordance with the IEE Regulations and any local 
regulations, which apply.  Wiring must be completed 
in heat resistant 3-core cable.  (Size 1.0mm

2

 CSA)  

Boilers are normally supplied for 230 volts. 50 Hz. 
Internal  fuse  rating  of  each  module  is  2  Amperes.  
External fuses should be 5 Amperes for all boilers. 
 
The method of connection to the mains electricity 
supply must facilitate complete electrical isolation of 
the boiler module with a contact separation of at least 
3mm in all poles. A mains isolator must be provided 
adjacent to the boiler in a readily accessible position.  
The supply should only serve the boiler.  Further 
details regarding connection to the electricity supply 
are given in 

BS 3456

 (CEE 10 Part 1, CEE11 Part 1). 

 

NOTE!

  Volt free contacts electrical supplies must 

also be isolatable when fitted (see note on fascia). 
 

9.1 Mains Cable Connection 
 

The path of the mains cable is shown in Figure No. 4.  
The length of the conductors between the cable 
anchorage and the terminals must be such that the 
current carrying wires become taut before the earth, 
should the cable slip out at the cord anchorage. 
 

9.2 Boiler Wiring Diagram 

The boiler-wiring diagram is shown in Figure No. 5.  
This wiring diagram is also fitted inside each boiler 
cover. 
 

9.3 Indication Signals and Volt Free Contacts

 

 
If the boilers are to be wired to external indicator 
lights or alarms, it is preferred that each module 
should be fitted with a Volt Free Contact kit to divorce 
any external wiring from the internal control wiring.   
 
The kit (P No. 563605145) may be fitted prior to 
delivery or on site, the mounting rail for the 3 relays 
being pre-installed on each module.  3 signals can be 
derived from the controls: - 
 
a) 

Normal run  - 

derived from terminal 11 on 

main terminal rail. 

b) 

Overheat  - derived from terminal 8 on main 
terminal rail. 

 
c) 

Lockout  - derived from terminal 7 on main 
terminal rail. 

 
Each of these 230V signals are wired to a separate 
relay coil and the volt free change over contacts can 

Содержание WESSEX-HE 200

Страница 1: ...BE READ AND UNDERSTOOD BEFORE INSTALLING COMMISSIONING OPERATING OR SERVICING EQUIPMENT WESSEX HE 200 WESSEX HE COUNTY HOT WATER BOILER FOR HEATING AND DOMESTIC HOT WATER INSTALLATIONS INSTALLATION CO...

Страница 2: ...ating safely and efficiently Maintenance Agreements 01202 662555 Regular routine servicing of equipment by Hamworthy service engineers inspects the safety and integrity of the plant reducing the risk...

Страница 3: ...PPLIANCE INSTALLED IN A SEPARATE BOILERHOUSE WITH ADEQUATE VENTILATION AND IS NOT CERTIFIED FOR USE IN DOMESTIC APPLICATIONS THIS BOILER IS FOR USE ON GROUP H NATURAL GAS 2ND FAMILY I2H AND LPG PROPAN...

Страница 4: ...SYSTEM 5 6 1 Suction 6 2 Design Waste Gas Volume and Temperature 6 3 Flue Condensation 6 4 Surface Temperature 6 5 Flue Pipe Location 7 0 AIR SUPPLY 6 7 1 Air Supply by Natural Ventilation 7 2 Air Su...

Страница 5: ...ernal Controls 2 Installation Noise 11 7 User s Instructions 12 0 FAULT FINDING 13 12 1 Summary of Safety Features 12 2 Fault Finding 12 3 Causes of Lockouts 13 0 SERVICING 14 14 0 REPLACEMENT OF FAIL...

Страница 6: ...HAMWORTHY HEATING LTD WESSEX HE 200 BOILER 500001008 K iv...

Страница 7: ...he Wessex HE has a low water content and water flow rates MUST be maintained at or above the mini mum levels shown in Section 8 and Fig 3 1 2 This boiler must be installed and serviced by a competent...

Страница 8: ...6 0 Water Content not including headers litres 20 40 System Design Flow Rate 11 C DT Rise l s 4 28 8 56 Minimum Flow Rate 15 C DT Rise l s 3 42 6 83 Shipping Weight kg 257 515 ELECTRICAL DATA Power Co...

Страница 9: ...treated to prevent precipitation of scale or sludge in the boiler water passageways Details of additives can be obtained from any reliable manufacturer of water treatment products or the local Water A...

Страница 10: ...Supply pipes must be fitted in accordance with BS 6891or UP 2 as appropriate Pipework from the meter to the boiler must be of adequate size Do not use pipes of a smaller size than the boiler gas conne...

Страница 11: ...the flue exceeds 4metres 6 2 Exhaust Gas Volume and Temperatures The volumes etc relating to Propane firing can be found in Appendix A It is recommended that the volume and temperature of the waste g...

Страница 12: ...ombustion and general ventilation in addition to that required for any other appliance 7 1 Air Supply by Natural Ventilation The purpose provided space housing the boiler must have or be provided with...

Страница 13: ...t connection A vent pipe and cold feed pipe must be fitted to the water system between the boiler and the first isolating valve in the water system The sizes of these pipes are shown below The vent pi...

Страница 14: ...water flow rate shown in Figure No 3 is maintained It is recommended that a water flow switch is fitted to the system The switch should be connected such that the boiler cannot fire unless the water f...

Страница 15: ...s for all boilers The method of connection to the mains electricity supply must facilitate complete electrical isolation of the boiler module with a contact separation of at least 3mm in all poles A m...

Страница 16: ...o connecting the boilers to the flue system Care must be taken to prevent damage to the casings prior to contract completion NOTE Fit the top insulation panel to the boiler prior to installing the flu...

Страница 17: ...ion 7 iii The system is fully charged with water ready to receive heat all necessary valves are open and the pump is running and circulating the water iv The pipework and valve arrangement is installe...

Страница 18: ...e test point and for reference CO2 measurements should be between 9 and 10 or 3 5 to 5 0 O2 Normal CO levels should not exceed 200 ppm NOTE All the above measurements refer to dry flue gas samples 11...

Страница 19: ...uit if fitted is made A 230 Volt supply on the Programmer Terminal No 1 will determine this c Check that the remote stop start circuit loop across terminals C5 and C6 is made Check Fascia mounted swit...

Страница 20: ...filter if fitted pressure gauge etc are in a serviceable and working condition and still comply with the relevant and aforementioned standards and Codes of Practice 13 2 1 Remove controls cover by un...

Страница 21: ...e differential pressure switch Bundy pipes to check that they are clear when they have been detached from the pressure switch to prevent damage to the diaphragm d Gently brush both sides of swirler lo...

Страница 22: ...system This is best carried out by specialists using suitable chemicals Follow the chemical manufacturer s recommendations and instructions regarding method solution strength and safety and handling...

Страница 23: ...recautions 13 4 9 Clean up mating surfaces and re assemble covers to tube plates with new gaskets lightly greased before assembly Torque the M12 bolts down evenly to 81Nm 13 4 10 a Re assemble baffles...

Страница 24: ...nd 5 pin Wieland plug fitted and that there is a replacement rubber gasket packed loose Un plug fan assembly from main controller wiring loom Remove the four M5 Pozidrive screws holding the controls b...

Страница 25: ...rked 3 COM c Green Yellow wire to earthing terminal Tighten cable gland Check switch is set to 1 2 mbar and replace cover plate Start the boiler several times to check for reliability 14 6 Control The...

Страница 26: ...eads to the appropriate item spade connectors Release switch or lamp from mounting fascia by pressing in the plastic retaining lugs at the top and bottom Pull components out frontwards Push in new com...

Страница 27: ...noid Valve 533903030 Pilot Solenoid Coil 533903031 Differential Pressure Switch 533901394 Control Thermostat Landis Gyr 339009345 IMIT 533901178 Temperature Limiter Landis Gyr 339011044 IMIT 533901179...

Страница 28: ...HAMWORTHY HEATING LTD WESSEX HE 200 BOILER 500001008 K 22 Figure No 2 Typical Boiler Installation...

Страница 29: ...HAMWORTHY HEATING LTD WESSEX HE 200 BOILER 500001008 K 23 Figure No 3 Wessex HE 200 Module Waterside Pressure Loss...

Страница 30: ...4 FN FN L N E 24 Figure No 4 Terminal and Mains Cable Layout KEY I BOILER CASING II CABLE CLAMP III SUGGESTED CABLE ROUTE IV CABLE GUIDE V TERMINAL BLOCK VI CONTROL THERMOSTAT VII WIRING DETAIL VIII E...

Страница 31: ...I Power ON Lamp Red II Temperature Limiter III Control Thermostat IV EMC Filter V 2A Fuse VI Sequence Controller inc Layout VII Gas Pressure Switch if fitted VIII Probe Test Link Terminal IX Flame Pro...

Страница 32: ...BOILER CASING III PROGRAMMER IV GAS VALVE WIRING PLUG V PILOT BURNER VI BY PASS GAS VALVE VII MAIN GAS VALVE VIII GAS ORIFICE IX Rp1 GAS CONNECTION X PRESSURE TEST POINTS XI DIFFERENTIAL PRESSURE SWIT...

Страница 33: ...nition Circuit Off Pilot Proving Period Starts YELLOW RED Position E Main Gas Valve opens RED YELLOW Position F Pilot Gas Valve Closes YELLOW GREEN Position G Burner Normal Run GREEN WHITE Position H...

Страница 34: ...HY HEATING LTD WESSEX HE 200 BOILER 500001008 K 28 1755 1190 400 600 377 BS 4504 PN6 80 DIA 344 I DIA 320 215 102 300 OUTLET 884 320 300 INLET Rp 1 GAS 540 22 DIA 640 Figure No 9 Boiler Dimensions Cle...

Страница 35: ...essex Pilot Burner Assembly Key I ELECTRODE PROBE SCREW 748132146 II SPARK ELECTRODE 333801440 III FLAME PROBE 533805006 IV JET CARRIER 333310871 V IGNITER BLOCK 333311465 VI PILOT INJECTOR 331101959...

Страница 36: ...HAMWORTHY HEATING LTD WESSEX HE 200 BOILER 500001008 K 30 BS 4504 PN6 80 DIA Rp 1 GAS 600 358 I DIA 775 711 775 221 775 141 1345 1031 45 Rc Rc Figure 11 Arrangement Drawing Wessex HE County...

Страница 37: ...al Gas is increased to 17 5mbar for Propane f Relevant labels are replaced to indicate the appropriate gas for which the boiler module is set up to fire The following tables paragraphs and figures usi...

Страница 38: ...r across the orifice NOTE The above is a first order check Final setting must be made using a gas meter 11 5 2 Combustion Checks A flue gas sampling point is provided in the front boiler casing see Fi...

Страница 39: ...OILER CASING III PROGRAMMER IV GAS VALVE WIRING PLUG V PILOT BURNER VI NOT USED VII MAIN GAS VALVES 2 OFF VIII GAS ORIFICE IX Rp1 GAS CONNECTION X PRESSURE TEST POINTS XI DIFFERENTIAL PRESSURE SWITCH...

Страница 40: ...o 8 Burner Flow System Schematic Propane KEY I Manual Gas Valve Ball Type II Control Gas Valves III Not Used IV Pilot Gas Valve V Pilot Burner VI Main Burner VII Differential Pressure Switch VIII Burn...

Страница 41: ...HAMWORTHY HEATING LTD WESSEX HE 200 BOILER 500001008 K 35 NOTES...

Страница 42: ...HAMWORTHY HEATING LTD WESSEX HE 200 BOILER 500001008 K 36 NOTES...

Страница 43: ...Notes...

Страница 44: ...y reserves the right to make changes and improvements which may necessitate alteration to the specification without prior notice Connect direct Direct Dial Telephone and Fax Numbers Direct Email Addre...

Отзывы: