28
Hampton H35 Direct Vent Freestanding Gas Stove
LOG SET
INSTALLATION
Read the instructions below carefully and
refer to the diagrams. If logs are broken
do not use the unit until they are replaced.
Broken logs can interfere with the pilot
operation.
The gas log kit contains the following:
a)
02-43
Rear Log
b)
02-56
Middle Left Log
c)
02-44
Front Left Log
d)
02-46
Left Top Log
e )
02-45
Front Right Log
f)
02-47
Center Log
g)
02-48
Middle Right Log
h)
Embers
i)
Lava
Embers
Embers
The "02" refer numbers (i.e. 02-43) are
molded into the rear of each log.
1)
Carefully remove the logs from the box and
unwrap them. The logs are fragile, handle
with care -
do not force into position.
2)
Lift off the Cast Top and remove the glass
front (see page 36).
3)
Sprinkle the embers on the left and right
sides of the firebox base.
A) 02-43
D) 02-46
G) 02-48
C) 02-44 B) 02-56
F) 02-47
E) 02-45
10) Adjust Vent restrictor setting: To set the
Vent restriction as indicated in the diagram,
simply loosen the screws and push the
vent restrictor plate to the correct position.
Tighten the screws.
Vent Restrictor setting at
Low Btu for Straight
Horizontal Venting
11) Attach the label "This unit has been con-
verted to..." on top of the Serial # decal over
the higher Btu information.
12) Check for gas leaks.
13) Check inlet and outlet pressures.
14) Check operation of flame control. Check for
proper flame appearance and glow on logs.
OPTIONAL BRICK PANEL
GAS FIREPLACE
INSTALLATION
Unit Btu/h Restrictor Opening
H35 NG 30,000 A 1-3/4" (45mm)
H35 LP 28,500 A 1-3/4" (45mm)
1)
Remove the cast top and glass front (see
manual for instructions).
2)
Remove the log set if installed.
3)
Insert the back brick panel first by carefully
slipping it between the back wall of the
firebox and the rear log bracket.
Diagram 1
4)
Before installing the side brick panels, loos-
en the screws for the brick tabs enough so
that you can slide the brick tabs on to the
screws easily but that the tabs are secure.
For the location of the side brick tab screws
see diagram 1.
Diagram 2
5)
Put the side panels in next. Slide them in
from the front and push them flat up against
the wall. Be very careful not to scratch
them on the firebox hardware.
6)
Install the brick tabs. See diagram 2.