34
"
!
!
Saw-Spindle Moulder
B3 / B3 e-classic
1.
Transport the machine to the installation site as
instructed in the “Transport“ chapter and the enclo-
sed transport or installation instructions.
2.
Position the machine with the aid of a spirit level
to ensure that the machine functions precisely and
operates smoothly.
If the floor is uneven, use blocks to level the machine.
!
Spirit levels
"
blocks
7.3 Positioning and levelling the machine
Fig. 7-2: Positioning the machine
3.
If necessary, the machine can be bolted down to the
floor with the transport brackets.
!
Transport brackets
Fig. 7-3: Floor mounting
4.
Before operating the machine, remove the wedges
from the lower tracks and sliding table on both sides.
5.
Remove the oxidation protective layer from all blank
machine parts.
Setup and installation
Fig. 7-4: Transport locking device Sliding table