![Hammer A2-26 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/hammer/a2-26/a2-26_operating-instructions-manual_3450113068.webp)
68
Maintenance
10.1 Maintenance schedule
The following maintenance work must be performed at the prescribed intervals.
Chap.
Task to execute
Dail
y
Ev
er
y 8 oper
at
in
g hour
s
Ev
er
y 80 oper
at
in
g hour
s
Mont
hl
y
Tw
ic
e a y
ear
Pa
ge
X
Check kickback guards/clean transport rollers
X
X
Check belt tension and belt condition
X
X
X
Lubricate the thicknessing table height adjust-
X
X
Test the emergency stop if the machine is
X
Test the red stop button as the emergency
stop if the machine is not equipped with an
X
10.2 Cleaning and lubricating
●
Do not use compressed air to clean, as this will blow dust and shavings into
the various ball bearings and guides.
●
Only use low dust emission vacuum to remove dust deposits.
●
Carry out cleaning when required, after each workday or at the very latest
after 8 hours of operation.
NOTICE
Do not use graphite and MoS2 sprays
Guide tracks could be destroyed.
−
Only use High Performance Grease (Art. Nr. 10.2.001) for
lubrication.
NOTICE
Caustic or abrasive cleaning detergents
Damage to the surface of the machine
−
Never use caustic or abrasive cleaning detergents.
Содержание A2-26
Страница 6: ...6 Table of contents 12 3 Spare parts list 86 12 4 Circuit diagram 92 ...
Страница 67: ...67 A2 26 Maintenance 10 Maintenance ...
Страница 92: ...92 Attachment 12 4 Circuit diagram ...
Страница 93: ......