![Hamilton XE Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/hamilton/xe/xe_operational-manual_585032009.webp)
Document #101-0079
9
11/30/17
IV. TESTING
After installation, a short test may be performed to verify correct installation.
For testing, be sure switch #1 is
OFF
. Be sure to test with a quantity of bills.
TEST
DESIRED RESULT
Turn on unit
Decimal point flashing
Insert bill
Payout proper change for each bill type
Should this unit fail to operate accordingly, check for an error code and refer to the Troubleshooting
section of this manual.