background image

Instruction Manual REG 21 

 

Safety precautions 

1.1 Appropriate use 

The REG 21 pressure regulator is designed for measuring, displaying, monitoring and 
regulating positive and negative overpressures and differential pressures of non-
aggressive, gaseous media. 

 

 
Always observe the operating requirements

—particularly the permissible supply 

voltage

—indicated on the rating plate and in the “Technical data” section of this 

manual. 
 
The instrument may only be handled as indicated in this manual. Modifications to the 
instrument are prohibited. The manufacturer is not liable for damages caused by 
improper use or failure to follow these instructions. Violations of this type render all 
warranty claims null and void.

 

 
 

1.2 Shipping, assembly, electrical connections and start-up 

Do not close the pressure input ports when shipping, as changes in barometric 
pressure could damage instruments with low measuring ranges.

 

 
Only technical personnel who are appropriately trained and authorized by the 
operator of the facility may assemble the instrument and set up its electrical 
connections.

 

 
The instrument may only be operated by appropriately trained individuals who have 
been authorized by the operator of the facility. 
 
Pressurized air or breath is not to be used for performance tests, as this could 
damage instruments with low measurement ranges.

 

 
Measurement errors may occur if the instrument is not kept protected from sunlight. 
 
Specific safety precautions are given in individual sections of this manual. 
 
 

1.3 Troubleshooting, maintenance, repairs, disposal 

The individual responsible for the electrical connections must be notified immediately 
if the instrument is damaged or if errors occur. 
 
This individual must take the instrument out of service until the error has been 
corrected and ensure that it cannot be used unintentionally. 

 
Always unplug the power cord before opening the instrument! 

 
This instrument requires no maintenance. 

 

Only the manufacturer may perform repairs that require the housing to be opened. 
 

Содержание REG 21

Страница 1: ...ssure Regulator halstrup walcher GmbH Stegener Stra e 10 D 79199 Kirchzarten Germany Phone 49 0 76 61 39 63 0 Fax 49 0 76 61 39 63 99 E Mail info halstrup walcher com Internet www halstrup walcher com...

Страница 2: ...ce of zero point calibration steps 12 3 6 Overload protection 12 4 Identification 13 4 1 Included in shipment 13 4 2 Product labelling 13 4 3 Models 13 5 Electrical connections and installation 14 5 1...

Страница 3: ...lifecycle of the instrument It must be provided to any individuals who assume responsibility for operating the instrument at a later date It must include any supplementary materials provided by the ma...

Страница 4: ...nges Only technical personnel who are appropriately trained and authorized by the operator of the facility may assemble the instrument and set up its electrical connections The instrument may only be...

Страница 5: ...symbols given below are used throughout this manual to indicate instances when improper operation could result in the following hazards WARNING This warns you of a potential hazard that could lead to...

Страница 6: ...onal features worth highlighting Overload protection Adjustable switching hysteresis High level of sensitivity High level of accuracy and long term stability Automatic zero point correction Low temper...

Страница 7: ...the instrument Display The display shows the measured differential pressure or overpressure in the units indicated on the housing next to the display Positive values are displayed as is negative value...

Страница 8: ...ay of the parameters of switching output 1 Display of the parameters of switching output 2 Starting manual zero adjustment Switch on value 0 to 100 Default 35 switch of value 0 to 100 Default 15 switc...

Страница 9: ...n value Switch of value Switch direction see section 6 1 setting parameters for switching output 2 hold for 2 s display functions Key sequence Values shown displaying parameters for switching output 1...

Страница 10: ...ges in pressure brightness display brightness zero point calibration automatic or manual zero point calibration options relay output 1 switch on value pressure threshold value that activates the switc...

Страница 11: ...on value relay 2 p4 switch off value relay 2 output states relay 1 output states relay 2 The numbers indicate the terminal assignment see fig 6 Fig 4 Behaviour of switching outputs switch direction 0...

Страница 12: ...oint a valve briefly closes both pressure ports for six seconds p 0 The instrument then checks for 3 seconds to determine whether the deviation from zero is within the permissible range If not e g if...

Страница 13: ...umber the CE emblem The second label indicates the pin assignment 4 3 Models The following instrument models are available measurement ranges 0 50 Pa to 0 100 kPa analog outputs 0 10 V 5 5 V 0 20 mA 4...

Страница 14: ...with a rectangular recess 92 0 8 mm x 45 0 6 mm using the installation parts included in the shipment 5 2 Instrument connections 5 2 1 Pressure ports Connect tubing 6 5 mm for reference pressure at th...

Страница 15: ...ntial and the power supply has been switched off The instrument is operates with a floating ground Set up the electrical connections as indicated on the housing label or in fig 6 Fig 6Pin assignment f...

Страница 16: ...on 7 The zero point is then calibrated if this function is part of the instrument s program If zero point lies outside of the permissible range the instrument generates an error message see section 7...

Страница 17: ...outputs and analogue outputs WARNING Hysteresis is critical for all switching values see fig 5 in order to prevent the relay from fluttering or the transistors from periodically switching on off 6 1 1...

Страница 18: ...ed parameter function as indicated in table 5 1 Enter parameter mode by pressing the following keys in sequence 4 Function and parameter ID will appear 5 Example Calling up the basic settings paramete...

Страница 19: ...Press one of the set keys or to save the value 5 The instrument will display the function and parameter ID for the next parameter 6 Set the remaining parameters in the same way 7 Example Setting the...

Страница 20: ...set the flashing digit or sign 3 Press the enter key to return to the decimal places 4 Press the enter key to complete the setting process 5 Press one of the set keys or to save the values 6 The instr...

Страница 21: ...use Corrective Action E003 overloaded pressure measurement capsule pressure too high send the instrument to the manufacturer for repair E004 pressure measurement capsule is pressurized during zero poi...

Страница 22: ...emperature 10 to 50 C storage temperature 10 to 70 C relative humidity 0 80 EMC standards EN 55011 EN 61000 4 3 EN 61000 4 6 conformity declaration of conformity available upon request Electrical data...

Страница 23: ...Instruction Manual REG 21 23 Physical data pressure port 2 pressure ports 6 5 mm housing material glass reinforced Noryl mounting orientation horizontal Table 7...

Страница 24: ...Instruction Manual REG 21 24 9 Dimension drawings Fig 10 housing dimensions switch panel housing...

Страница 25: ...Instruction Manual REG 21 25 10 Certificate of Conformity 7100 003674C_REG21 doc 07 2018 Me...

Отзывы: