background image

19

20000225117B

7  Instructions to the User

Instruct and demonstrate the safe and efficient operation of the boiler, heating system and domestic hot water system.

Advise the user, that to ensure the continued efficient and safe operation of the boiler, it is recommended that it is checked and
serviced at regular intervals.  The frequency of servicing will depend upon the particular installation and usage, but in general once
a year should be enough.

Draw attention, if applicable to the current issue of the Gas Safety (Installation and Use) Regulations, Section 35, which imposes
a duty of care on all persons who let out any property containing a gas appliance in the UK.

It is the Law that servicing is carried out by a competent person.

Advise the user of the precautions necessary to prevent damage to the system and building in the event of the heating system being
out of use during frost and freezing conditions.

Reminder - Leave these instructions and the “Benchmark” logbook with the user.

8  Servicing

REMEMBER, When replacing a part on this appliance, use only
spare parts that you can be assured conform to the safety and
performance specification that we require. Do not use
reconditioned or copy parts that have not been clearly authorised
by Halstead Boilers Ltd.

Products of Combustion Check

Note: To obtain a products of combustion reading, remove the
front panel and remove the control box as descibed in the
relevant paragraphs of section 4.9.   Next, remove the cap from
the sampling point, located on the top of the left hand side of the
inner casing, see diagram 8.1.

Connect the analyser tube on to the nipple.

WARNING.    The multifunctional control and fan operate on
mains voltage, terminals will become live.

Switch on the electrical supply and gas supply then operate the
boiler.

On completion of the test switch off the electrical supply and gas
supply, remove analyser tube and replace sampling point cap.

Servicing

Before servicing turn off the gas and isolate the electrical supply
to the boiler.

After completing a service always test for gas soundness, make
electrical checks and carry out functional check on controls.

Unless stated otherwise all parts are replaced in the reverse
order to removal.

8.1 Access

Remove the boiler front casing panel, refer to paragraph 6.8.

Remove the bottom plinth panel by unscrewing the two dog
point screws securing the panel to the boiler plinth, see diagram
8.4.

Disconnect gas valve from gas cock and unplug electrical plug
from gas valve, firstly removing electrical plug securing screw,
see diagram 8.2.

Unclip electrical wires from control box support bracket, see
diagram 8.3.

Undo the five self-tapping screws that secure the combustion
chamber front and carefully withdraw it together with the burner
and gas valve assembly, taking care not to strain the ignition,
sensing and earth leads, see diagram 8.5.

Note: When replacing burner in combustion chamber make
sure it fits correctly on the guides.

Diagram 8.2

10145

GAS SERVICE
COCK UNION

ELECTRICAL
PLUG

Diagram 8.1

SAMPLE POINT

Disconnect the ignition, sensing and earth leads from the
burner and remove by drawing the leads though the grommet,
see diagram 8.5 & 8.9.

Remove the three self-tapping screws from the lower part of the
control box support bracket, see diagram 8.6.

Undo the wing nut that secures the top of the heat shield and
carefully hinge down control box and heat shield, see diagram
8.6.

Release the three toggle latches that secure the boiler access
door and remove, see diagram 4.10.

SECURING
SCREW

Содержание Buckingham 4

Страница 1: ...of the appliance and must to comply with the current issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation To b e l e f t w i t h t h e u s...

Страница 2: ...provide information on substances hazardous to health Ceramic Fibre Insulation Pads GlassYarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint...

Страница 3: ...the whole system including the boiler be drained off to avoid the risk of freezing up If an immersion heater is fitted to the hot water cylinder make sure it is switched off Maintenance Toensuretheco...

Страница 4: ...te control Note If the boiler is turned OFF at the boiler temperature control wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic light...

Страница 5: ...ety Installation and Use Regulations The appropriate Buildings Regulations either The Building Regulations The BuildingRegulations Scotland The Building Regulations Northern Ireland The Water Fittings...

Страница 6: ...TIONS MIN MAX To floor level FLOOR LEVEL 9922 1 General Data Diagram 1 5 MINIMUM CLEARANCES LEVEL WITH WORKTOP 9923 494 MIN 494 MIN CUPBOARDS WORKTOP 10 10 BOILER BOILER 5 MAX 900 MIN 860 Diagram 1 3...

Страница 7: ...l obstruct the openings vents in the compartment A compartment used to enclose the boiler must be designed and constructed specifically for this purpose An existing cupboard or compartment modified fo...

Страница 8: ...essarily high when the central heating pump is off The domestic primary flow and return must be 28mm o d The installation must comply with the current issue of BS5546 and BS6700 see diagram 2 1 If the...

Страница 9: ...must be adequately sealed and clamped using proprietary fittings suitable for the flue liner used see diagram 3 1 The flue should preferably end above ridge height but at the least above the eaves of...

Страница 10: ...ir vents must have minimum areas see Compartment Air Vent table Thefiguresquotedrefertotheminimumacceptable effective area Both the high and low level openings must communicate with the same room or m...

Страница 11: ...emaining lower connections may be used for the gravity domestic hot water return Fit plugs into any unused boiler tappings 4 3 Water Connections Fully Pumped Systems Fit suitable fittings into the boi...

Страница 12: ...gas pipework must be along the left hand side of the boiler 4 Installation No 8 SCREW 4 Diagram 4 4 PIPEWORK CASING CLEARANCES 9860 Diagram 4 6 PLASTIC PEG PLASTIC PEG SPRING CLIP SIDE CASING R H SHOW...

Страница 13: ...e factory with the control box and heat shield fitted in the lower casing height position 4 Installation 9863 SIDE CASINGS FITTING Diagram 4 7 MAX SIDE CASING R H MIN BOILER PLINTH FRONT CASING BRACKE...

Страница 14: ...crew select and fit appropriate restrictor CFF100 marked D CFF115 marked E then secure in place with the previously removed screw To connect a condensate drain remove plastic end stop by depressing th...

Страница 15: ...rain should be fitted To use the condensate drain connection on the chimney flue adapter remove end stop see diagram 4 13 A 22mm plastic overflow pipe should be used to fit on to the drain connection...

Страница 16: ...ke sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the earth cond...

Страница 17: ...x Diagram 6 1 BOILER COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J...

Страница 18: ...has lit making sure that all other gas burning appliances and pilot lights are off Gas rate Buckingham 4 CFF100 3 3m3 h 115ft3 h Buckingham 4 CFF115 3 8m3 h 136ft3 h is for guidance only dependent on...

Страница 19: ...operate on mains voltage terminals will become live Switch on the electrical supply and gas supply then operate the boiler On completion of the test switch off the electrical supply and gas supply re...

Страница 20: ...ng back to disengage the retaining lugs then lift up When replacing the flue hood ensure that it rests on the guides and that the rear of flue hood is located under the pegs at the rear and pushed dow...

Страница 21: ...elevant instructions in sections 8 3 and 8 4 8 3 Burners and Injectors Remove the screws and nuts securing the burner support bracket to the combustion chamber cover see diagram 8 9 Remove the graphit...

Страница 22: ...calling for heat and circuit water is cold If Reset LED is lit check water system for overheating reset by turning temperature control knob off and on If the LED coding is showing an ignition failure...

Страница 23: ...cause the burner to go out Operationwillnormallyresumeontherestorationoftheelectrical supply Iftheburnerdoesnotrelightafteranelectricalsupplyfailureand theredneononthecontrolpanelislit turntheburnert...

Страница 24: ...ECTRODE IGNITION ELECTRODE BLOCK CONNECTOR THERMISTOR AIR PRESSURE SWITCH 3 15A FUSE BURNER LIT INDICATOR RESET INDICATOR JUMPER POSITION p bk bk w bk bk b r g bk b LS LIVE Switched N LS N g y g y g y...

Страница 25: ...ring screws two on control box two on the heat shield and lift off see diagram 10 1 Carefully pull the boiler temperature control knob away from the P C B CONTROL BOX COVER CONTROL BOX SECURING SCREWS...

Страница 26: ...ith the clear tube from the air pressure switch to the front fan connection as shown in diagram 10 5 and the electrical connections are made as shown in wiring diagram 9 4 10 9 Fan Refer to the releva...

Страница 27: ...ame and serial number information from the data label The data label is positioned on the heat shield see diagram 6 1 11 10 Key No Part No Description GC Part No 1 2000461898 Multifunctional control 2...

Страница 28: ...28 2000225117B Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions...

Отзывы: