background image

7

20000225117B

1 General Data

1.8 Boiler Location

This boiler is not suitable for outside installation.

The boiler casing can be fitted at two heights. Refer to
diagram 1.4.

The boiler is assembled at the factory with the control box and
heat shield fitted in the lower position.

The boiler must stand on a level floor, conforming with local
authority requirements and building regulations.
The base temperature is within the requirements of the current
issue of BS5258.  The boiler may stand on a wooden floor but
a metal base plate is required to protect plastic tiles and similar
floor coverings.

Suitable installation clearance needs to be available at the
sides of the boiler to facilitate direct connection of pipework and
making good around the flue assembly. The actual clearance
required will vary with site conditions.

When the boiler is to be installed level with work surfaces and
the like, minimum clearances should be provided as shown in
diagram 1.5.  Work tops which overhang the cupboard sides,
almost in contact with the casing top, require a larger minimum
air gap. Flush sided fixtures require the same overall minimum
space but can have a reduced air gap on one side.

Boilers to be installed under work tops or fixtures, should be
positioned to provide minimum clearances as shown in diagram
1.6.  To facilitate minimum clearances it may be necessary to
modify kitchen units and fixtures.

Combustible material must be 25mm (1in)away from the flue
components, see diagram 1.6.

A front access clearance for servicing of 700mm, should be
provided.

The boiler can be installed within a cupboard, refer to minimum
ventilation and clearances as shown in diagram 1.7

If the boiler is to be installed in a cupboard or compartment,
make sure that nothing will obstruct the openings/vents in the
compartment.

A compartment used to enclose the boiler must be designed
and constructed specifically for this purpose.  An existing
cupboard or compartment modified for the purpose may be
used.  Details of essential features of cupboard or compartment
design are given in the current issue of BS6798.

Diagram 1.6

MINIMUM CLEARANCES
UNDER WORKTOP, FIXTURES

9924

   10

   10

CUPBOARD

CUPBOARD

   10

WORKTOP
OR FIXTURE

25

Diagram 1.7

CUPBOARD MINIMUM
VENTILATION & CLEARANCES

DOOR

406cm

2

 FREE AREA

FOR VENTILATION

10mm

10mm

10mm

IMPORTANT

A CLEARANCE OF 10mm IS REQUIRED
BETWEEN THE FRONT OF THE APPLIANCE
AND THE FITTED DOOR.

THE VENTILATION SLOTS ON THE FRONT
OF THE APPLIANCE MUST BE KEPT CLEAR.

THE FREE AREA FOR VENTILATION MUST
NOT BE REDUCED IF A GRILLE IS FITTED.

CUPBOARD

CUPBOARD

406cm

2

 FREE AREA

FOR VENTILATION

11601

The boiler may be installed in any room, although particular
attention is drawn to the requirements of BS7671 with respect
to the installation of a boiler in a room containing a bath or
shower.  Any electrical switch should be so positioned that it
cannot be touched by a person using the bath or shower.  The
electrical provisions of the Building Standards (Scotland)
Regulations apply to such installations in Scotland.

Where the installation of the boiler will be in an unusual location,
special procedures are necessary the current issue of BS6798
gives detailed guidance on this aspect.

1.9 Heating System Controls

The heating system should have installed: a programmer and
room thermostat  controlling the boiler.

Thermostatic radiator valves may be installed, however they
must not be fitted in a room where the room thermostat is
located.

Note: For further information, see the current issue of the
Building Regulations, approved document L1, and the
references:

1) GIL 59, 2000: Central heating system specification (CheSS)
and

2) GPG 302, 2001: Controls for domestic central heating
system and hot water.  BRECSU.

Содержание Buckingham 4

Страница 1: ...of the appliance and must to comply with the current issue of the Gas Safety Installation and Use Regulations be handed to the user on completion of the installation To b e l e f t w i t h t h e u s...

Страница 2: ...provide information on substances hazardous to health Ceramic Fibre Insulation Pads GlassYarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint...

Страница 3: ...the whole system including the boiler be drained off to avoid the risk of freezing up If an immersion heater is fitted to the hot water cylinder make sure it is switched off Maintenance Toensuretheco...

Страница 4: ...te control Note If the boiler is turned OFF at the boiler temperature control wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic light...

Страница 5: ...ety Installation and Use Regulations The appropriate Buildings Regulations either The Building Regulations The BuildingRegulations Scotland The Building Regulations Northern Ireland The Water Fittings...

Страница 6: ...TIONS MIN MAX To floor level FLOOR LEVEL 9922 1 General Data Diagram 1 5 MINIMUM CLEARANCES LEVEL WITH WORKTOP 9923 494 MIN 494 MIN CUPBOARDS WORKTOP 10 10 BOILER BOILER 5 MAX 900 MIN 860 Diagram 1 3...

Страница 7: ...l obstruct the openings vents in the compartment A compartment used to enclose the boiler must be designed and constructed specifically for this purpose An existing cupboard or compartment modified fo...

Страница 8: ...essarily high when the central heating pump is off The domestic primary flow and return must be 28mm o d The installation must comply with the current issue of BS5546 and BS6700 see diagram 2 1 If the...

Страница 9: ...must be adequately sealed and clamped using proprietary fittings suitable for the flue liner used see diagram 3 1 The flue should preferably end above ridge height but at the least above the eaves of...

Страница 10: ...ir vents must have minimum areas see Compartment Air Vent table Thefiguresquotedrefertotheminimumacceptable effective area Both the high and low level openings must communicate with the same room or m...

Страница 11: ...emaining lower connections may be used for the gravity domestic hot water return Fit plugs into any unused boiler tappings 4 3 Water Connections Fully Pumped Systems Fit suitable fittings into the boi...

Страница 12: ...gas pipework must be along the left hand side of the boiler 4 Installation No 8 SCREW 4 Diagram 4 4 PIPEWORK CASING CLEARANCES 9860 Diagram 4 6 PLASTIC PEG PLASTIC PEG SPRING CLIP SIDE CASING R H SHOW...

Страница 13: ...e factory with the control box and heat shield fitted in the lower casing height position 4 Installation 9863 SIDE CASINGS FITTING Diagram 4 7 MAX SIDE CASING R H MIN BOILER PLINTH FRONT CASING BRACKE...

Страница 14: ...crew select and fit appropriate restrictor CFF100 marked D CFF115 marked E then secure in place with the previously removed screw To connect a condensate drain remove plastic end stop by depressing th...

Страница 15: ...rain should be fitted To use the condensate drain connection on the chimney flue adapter remove end stop see diagram 4 13 A 22mm plastic overflow pipe should be used to fit on to the drain connection...

Страница 16: ...ke sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the earth cond...

Страница 17: ...x Diagram 6 1 BOILER COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J...

Страница 18: ...has lit making sure that all other gas burning appliances and pilot lights are off Gas rate Buckingham 4 CFF100 3 3m3 h 115ft3 h Buckingham 4 CFF115 3 8m3 h 136ft3 h is for guidance only dependent on...

Страница 19: ...operate on mains voltage terminals will become live Switch on the electrical supply and gas supply then operate the boiler On completion of the test switch off the electrical supply and gas supply re...

Страница 20: ...ng back to disengage the retaining lugs then lift up When replacing the flue hood ensure that it rests on the guides and that the rear of flue hood is located under the pegs at the rear and pushed dow...

Страница 21: ...elevant instructions in sections 8 3 and 8 4 8 3 Burners and Injectors Remove the screws and nuts securing the burner support bracket to the combustion chamber cover see diagram 8 9 Remove the graphit...

Страница 22: ...calling for heat and circuit water is cold If Reset LED is lit check water system for overheating reset by turning temperature control knob off and on If the LED coding is showing an ignition failure...

Страница 23: ...cause the burner to go out Operationwillnormallyresumeontherestorationoftheelectrical supply Iftheburnerdoesnotrelightafteranelectricalsupplyfailureand theredneononthecontrolpanelislit turntheburnert...

Страница 24: ...ECTRODE IGNITION ELECTRODE BLOCK CONNECTOR THERMISTOR AIR PRESSURE SWITCH 3 15A FUSE BURNER LIT INDICATOR RESET INDICATOR JUMPER POSITION p bk bk w bk bk b r g bk b LS LIVE Switched N LS N g y g y g y...

Страница 25: ...ring screws two on control box two on the heat shield and lift off see diagram 10 1 Carefully pull the boiler temperature control knob away from the P C B CONTROL BOX COVER CONTROL BOX SECURING SCREWS...

Страница 26: ...ith the clear tube from the air pressure switch to the front fan connection as shown in diagram 10 5 and the electrical connections are made as shown in wiring diagram 9 4 10 9 Fan Refer to the releva...

Страница 27: ...ame and serial number information from the data label The data label is positioned on the heat shield see diagram 6 1 11 10 Key No Part No Description GC Part No 1 2000461898 Multifunctional control 2...

Страница 28: ...28 2000225117B Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions...

Отзывы: