5
1. Before Operation
5-1
MONITOUCH
Operations
1.
Before Operation
Procedure before Operation
1. Mount the S8 series on the mounting panel, install it and carry out wiring.
For more information, refer to “Chapter 3 ”.
2. Install peripheral devices, such as PLCs or temperature controllers, and carry out wiring.
For information on precautions, refer to the Connection Manual separately provided.
3. Turn the S8 series on.
4. Transfer the created screen data.
•
When transferring screen data for the first time:
For details, refer to “Transferring Screen Data to MONITOUCH for the First Time” (page 5-2).
•
Other cases:
For information on the procedure to change screen data with another, refer to the Operation
Manual.
5. Start MONITOUCH operation. To change to the RUN mode, refer to “Main Menu Screen” (page
5-3).
When the connection with controllers has been established, the RUN screen is displayed.
* If MONITOUCH does not operate normally and shows an error message, eliminate the cause
by referring to Chapter 6 or the S8 Series Reference Manual.
When turning the power on for the first time:
Other cases:
Содержание Monitouch S8 Series
Страница 1: ...S8 Series S8...
Страница 10: ...11 Features 2 Models and Peripheral Equipment 3 System Composition Product Outline...
Страница 34: ...31 Mounting Procedure 2 Power Supply Cable Connection Installation...
Страница 37: ...41 Coin type Lithium Battery S808C S806C S806M20 2 DIP Switches S808C S806C S806M20 Instructions...
Страница 44: ...51 Before Operation 2 Main Menu Screen 3 System Menu MONITOUCH Operations...
Страница 66: ...5 22 3 System Menu Please use this page freely...
Страница 67: ...61 Error Messages 2 Troubleshooting Error Handling...
Страница 74: ...71 Inspection and Maintenance 2 Warranty Policy Inspection and Maintenance...
Страница 78: ...7 4 2 Warranty Policy Please use this page freely...