11 / 48
Hakki Pilke 43 Pro
Translation
Version 6-2018
5.
Turn the log guide plate to
the operating position and
lock locking pin A into
place with cotter pin B
(Figure 5).
Place the in-feed
conveyor in the transport
position in reverse order.
Figure 5.
Figure 6.