=:
Fhq unktld `citrsldmsD
Xhe air volume adjustment board is in the left down corner in the electric control box3 by which you can
adjust the air volume due to the requirement5
c8 Fhq qdstqm ltrs ad eqnl sgd hmcnnq rhcd6 `mc b`m mns ad eqnl sgd bnqqhcnq8
d8 Knqahccdm sn trd sgd ctbs `r sgd eqdrg `hq tmhs8
e8 Ygd `hq rdmchmf9qdstqm cdrhfm rgntkc s`jd sgd hmcnnq `hq unktld chrsqhatshnm hmsn bnmrhcdq`shnm8
Ygdqd rgntkc ad ` bdqs`hm chrs`mbd adsvddm `hq rdmchmf gnkd `mc `hq qdstqm gnkd6 sn oqdudms sgd
`hq hm rgnqs bhqbths8 Rd`mvghkd6 onrhshnm `mc chqdbshnm ne `hq ntskds rgntkc bnmrhcdq sgd bnnkhmf9gd`shmf
deehbhdmbx6 `mc oqdudms sgd v`ql `hq mns adhmf aknvdc cnvm adb`trd ne sgd snn ghfg `hq ntskds8
Lnnc ohohmf
85<m { 9m
Wuspension
bolts
Meat
insulation
F downhill grade
of 86877 or more
Io not pipe under water
Oeep free from traps
Fvoid riding across an elevation
Fir vent
Nloqnodq ohohmf
4>5 Idrhfm ne sgd ctbs `mc sgd `hq ntskds
`8 Hntms sgd mdbdrr`qx JXU sn cdrhfm sgd `hq rdmchmf9qdstqm ctbs `mc sgd admc8 Fmc rdkdbs sgd
oqnodq lncdk `bbnqchmf sn sgd JXU8 Knqahccdm sn trd sgd ghfg JXU tmhs `r sgd knv JXU tmhs6 nq sn
trd vhsgnts ctbs8
a8 Ygd `hq rdmchmf9qdstqm ctbs ltrs ad gd`s hmrtk`sdc8
b8 Knqahccdm sn fds sgd `hq qdstqm chqdbskx eqnl sgd bdhkhmf8
Kor drain pipe3 use hard TZH general purpose pipe ZT49</N5I58+0 which can be purchased locally5
[hen connecting3 insert a TZH pipe end securely into the drain socket before tightening securely
using the attached drain hose and clamp5 Fdhesive must not be used connection of the drain socket
and drain hose /accessory05
/c0
?8 Iq`hm Uhohmf
/a0 Irain piping should always be in a downhill grade /86<7{868770 and avoid riding across an elevation
or making traps5
[hen connecting the drain pipe to unit3 pay suffcient attention not to apply excess force to the piping
on the unit side5 Flso3 fix the piping at a point as close as possible to the unit5
/b0
Содержание MRV II AV08NMVERA
Страница 112: ...112 5 Wiring connection among units ...