Step 3 - Installation of the Outdoor Unit
A. Prepare the Outdoor Unit for Installation
• Remove all packaging.
• Place supplied vibration pads onto outdoor unit’s feet.
• Use team lift to place the unit on a solid foundation, 8” above the highest snowfall.
Correct
Installation
Drainage
D
H
Correct
Installation
Minimum height(H) should be higher than the highest
snowfall depth(D)(H=D+8”)
D
H
Incorrect
Installation
Unit may become covered in snow if the stand height is
insufficient.
Drainage
Drainage
Incorrect
Installation
Stand top is
covered
clearance is too
small, causing
inadequate
drainage.
Installation Instructions