2U14CS1ERA-SM
Connector wiring diagram
11
Domestic Air Conditioner
4.2
᧶
outdoor unit
Connectors
PCB(1) (Control PCB)
1) CN1,CN2 Connector for power N and L
2) CN3
ǃ
CN8 Connector for ground
3) CN23 Connector for DC POWER 15Vand 5V to the module board
4) CN9,CN10 Connector for CN9,CN8 on the module board
5) CN22 Connector for fan motor
6) CN11 Connector for four way valve coil
7) CN17,CN18,CN19,CN20,CN21
ǃ
CN47 Connector for thermistors
8) CN24 Connector for communicate between the control board and the module board
9) CN28,CN25 Connector to P and N of the module board
10) CN36 Connector for communicate between indoor and outdoor unit
11) CN15
ǃ
CN16 Connector for electric expansion valves
PCB(2) (module PCB)
CN10 Connector for the DC power 5V and 15V form the control PCB
CN11 Connector for communicate between the control board and the module board
P( CN1), N(CN5) Connector for CN28,CN25 on the control board
LO (CN6),LI(CN7) Connector for reactor
AC_L(CN8),AC_N(CN9) Connector for CN10,CN9 on the control board
CN2(U), CN3(V), CN4(W) connector for the compressor
Note
: Other Designations
PCB(1) (Control PCB)
1) FUSE 1, Fuse (25A,250VAC)
2)LED 1 keep light representative normal ,if keep flash interval representative trouble Alarm
3)RV1,RV2,RV3 Varistor
Содержание 2U14CS1ERA
Страница 44: ...41 2U14CS1ERA SM ...
Страница 73: ...70 Domestic air conditioner WARNING CAUTION Installation 2U14CS1ERA SM ...
Страница 74: ...71 Domestic air conditioner Installation 2U14CS1ERA SM ...
Страница 77: ...Installation 2U14CS1ERA SM 74 Domestic air conditioner ...
Страница 78: ...Installation 2U14CS1ERA SM 75 Domestic air conditioner ...
Страница 79: ...Installation 2U14CS1ERA SM 76 Domestic air conditioner ...
Страница 82: ...Installation 2U14CS1ERA SM 79 Domestic air conditioner ...
Страница 86: ...83 Domestic air conditioner Removal of procedure 2U14CS1ERA SM ...
Страница 89: ...86 Domestic air conditioner Removal of procedure 2U14CS1ERA SM three two HOOKS ...
Страница 90: ...87 Domestic air conditioner Removal of procedure 2U14CS1ERA SM 3 horizontal flap flap flap flap flap ...
Страница 96: ... Domestic air conditioner Removal of procedure 2U14CS1ERA SM 8 ...
Страница 98: ...Domestic air conditioner Removal of procedure 2U14CS1ERA SM 9 ...
Страница 100: ... Domestic air conditioner Removal of procedure 2U14CS1ERA SM Loosen the csrews and pull the panel ...
Страница 102: ...99 Domestic air conditioner Removal of procedure 2U14CS1ERA SM 10 ...
Страница 103: ... Domestic air conditioner Removal of procedure 2U14CS1ERA SM 11 ...
Страница 104: ...101 Domestic air conditioner Removal of procedure 2U14CS1ERA SM 2 Loosen the fixing screws and remove the motor ...
Страница 105: ...Domestic air conditioner Removal of procedure 2U14CS1ERA SM 102 12 ...
Страница 106: ...103 Domestic air conditioner Removal of procedure 2U14CS1ERA SM and remove the reactor Loosen the screw ...
Страница 107: ...104 Domestic air conditioner Removal of procedure 2U14CS1ERA SM 13 Loosen the marked screws and pull out the backgurd ...
Страница 109: ...106 Domestic air conditioner Removal of procedure 2U14CS1ERA SM and remove the reactor Loosen the screw ...
Страница 110: ... SSHQGL 107 10 Appendix 10 1 Piping Diagrams 2U14CS1ERA SM ...
Страница 111: ...Domestic air conditioner Wring Diagram 108 10 2 Wiring Diagrams Indoor 2U14CS1ERA SM ...
Страница 116: ...W Hongjin Chen Huimin Li Peng Yang Bifei The end Sincere Forever Haier Group 88936935 2U14CS1ERA SM ...