Haibrain SW12 Скачать руководство пользователя страница 11

MANUAL CONTROL

Manual control can be achieved by pressing suitable momentary
acting keys wired to the Orange and Blue wires provided on the
unit. The Blue wire connects to the UP key and the Orange wire
connects to the DOWN key.
You can control the blind in 2 different ways:
-

Press and hold down the key until the blind reaches the
desired position.

-

Give the key a short press to start the blind moving in the
direction you want and then another short press to stop it at
the desired position.

You can also fully open or close the blind just by giving a short
key press to start the blind moving in the direction you want .
The blind will then travel to the fully open or fully closed posi-
tion (as determined electronically by internal counting) and after
adding a 6 second over travel will automatically shut off the ap-
propriate drive relay. The over travel is to ensure that the blind
fully reaches its end stop before the unit switches off its drive
relays.

HAIBRAIN

 X-10 CONTROL

The unit will respond to X-10 power line commands sent in
‘Standard’ and ‘Extended’ format.
The unit responds to ‘Standard’ X-10 messages ‘Address On’ ,
‘Address Off’ , BRIGHT and DIM .
‘ON’ fully opens the blind and ‘OFF’ fully closes it. A suitable
over travel depending on window size is added to the drive
time to ensure that the end stops are reached before the unit
switches its own relays off.

12

©

 

HAIBRAIN

Содержание SW12

Страница 1: ...SW12 SW12 IN WALL SHUTTER SWITCH 20516 20120530 SW12 ALL RIGHTS RESERVED HAIBRAIN USER MANUAL...

Страница 2: ...ources In case of improper usage or if you have altered and repaired the product yourself all guarantees expire Haibrain does not accept responsibility in the case of improper usage of the product or...

Страница 3: ...Transmitters Wireless components like remotes The signals of these components will be received by a controller with transceiver functionality IRRF 7243 TM13 or CM15Pro The Transceiver will translate t...

Страница 4: ...vided over more than one phase more than one group is no problem For bigger buildings or longer distances we advice you to use an active repeater instead of passive FD10 s 2 It is possible that Haibra...

Страница 5: ...he power line the noise will be filtered 4 The Haibrain X 10 protocol has several mechanism to avoid modules to be switched on or off by other sources than your Haibrain X 10 Controllers However it is...

Страница 6: ...allows a motor ized blind to be con trolled either manually from a momentary switch with two nor mally open contacts con nected to the unit or remotely by serial Haibrain X 10 Powerline messages sent...

Страница 7: ...Switch off appropriate mains fuse and master switch Important 230V 50Hz 3A per channel max 8 HAIBRAIN U P L N DN Down Up Blue Orange key Up Down key Live 230V Neutral SW12 M U P L N DN Blue Orange SW1...

Страница 8: ...of the switch Put the SW12 into the wall box and re fix the wall switch on the wall box Switch on mains fuse and master switch PROGRAMMING Before the unit can be used it has to be told what the window...

Страница 9: ...er give a short key press to start the blind going down and another short key press to stop it at the bottom or you can press and hold the key until the blind is fully down and then release it At this...

Страница 10: ...confusing when first trying to enter Install Mode since the user will not know how long it will take to get to the fully up position before starting to count the 5 second entry delay into Install To...

Страница 11: ...d moving in the direction you want The blind will then travel to the fully open or fully closed posi tion as determined electronically by internal counting and after adding a 6 second over travel will...

Страница 12: ...n for modules to switch on off sponta neously It is possible that a Haibrain X 10 System is installed at one of your neighbours using the same House Code To solve this problem try to change the House...

Страница 13: ...Pro software Yes you can select SW12 at Appliances You can partly open and close the SW12 using percentages The percentages will however not fully correspond with the real situation It has only 25 po...

Страница 14: ...for motors Sensitivity to power 50mV p pk 120 KHz line signals For signals 50mV AGC is applied X 10 Key codes On Off DIM DIM extended Terminals Screw terminals for L N UP relay DN relay Wires for UP k...

Страница 15: ...d other relevant provisions of the following Directives DIRECTIVE 2004 108 EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 15 December 2004 on the approximation of the laws of the Member States re...

Страница 16: ......

Отзывы: