OR-05/18/15
Maximizer
®
97 Owner’s Manual
11
Quality Water International
®
Installation
Installation Steps
A. Ensure that the bypass is left in the Service position.
(see Bypass Valve Overview)
B. Ensure the water supply is on.
C. Open the inlet valve and turn on the electricity to the water heater. For gas water heaters, return the gas
cock to “On.”
D. Open a cold water tap and allow the appliance to flush for 20 minutes or until approximately 72 gallons
(270 liters) have passed through the appliance. This procedure is required to meet NSF compliance.
Verify the flow rate on the controller, which indicates water flow.
(see Figure 3)
E. Adjust the blending valve if it is being used.
(see Blending Dial Overview)
F. Test the water at the test port to verify soft water.
G. Place the cover on the cabinet.
Complete the Installation
Step 12