51
SECTION 5,
continued
4. While holding the DO probe vertically with the tip pointing
down, gently screw the module cap onto the tip. Electrolyte
should leak out of the threads.
Note: If electrolyte does not leak out of the threads, air may remain
inside the module cap. To ensure accurate results, repeat this
procedure using more filling solution.
5. Attach the DO probe cable connector to the meter.
Figure 8
DO Probe Assembly
Cable
Connector
Calibration
and Storage
Chamber
(attached)
Sponge
Membrane
Cap
DO Probe
Body
Thermistor
Electrode
Calibration
and Storage
Chamber
Membrane
Protector