•
Exception
—Unexpected behavior
•
Running
—Connection is established
As an alternative, examine the LEDs in the PROFINET module.
Figure 12 Module LEDS
1
Network status LED
4
Link/Activity LED
2
Link/Activity LED
5
Port 2
3
Module status LED
6
Port 1
Network
status
LED
Module
status
LED
Status
PROFINET Event EtherNet/IP
event
Comments
Off
Off
The module has no
power.
Off
On
Pending
Waiting Ethernet
Link
Waiting Ethernet
Link
No ethernet cable
connected to
module
Ethernet cable
plugged on Port
2 in Mix IEP option.
On
On
Running
PLC connection
or Simulation on
PLC connection
or Simulation on
PLC in RUN mode
without/with
simulation on.
Blinking
Blinking
Running
Identify node
Identify the node
on the Network.
1 flash
On
Idle
PLC in STOP
mode
PLC is not in
RUN mode
2 flashes
On
Pending
Broken PLC
connection
Broken PLC
connection
42
English
Содержание SC4500
Страница 1: ...DOC343 52 90752 PROFINET and EtherNet IP modules 11 2021 Edition 2 User manual...
Страница 2: ......
Страница 4: ...Table of Contents 2...
Страница 6: ...Figure 1 Chain topology Figure 2 Star topology Figure 3 Ring topology 4 English...
Страница 26: ...16 Select the option Go Online 17 Select Download 24 English...
Страница 46: ...44 English...
Страница 47: ......