![Hach QC8500 Series 2 Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/hach/qc8500-series-2/qc8500-series-2_user-manual_577110033.webp)
31
Operation
4.1.2 Load state
During the load state, the sample loop is being filled with sample. When the valve
switches back to the inject state, the sample flowing through the sample loop is
trapped momentarily.
This sample, whose volume can be calculated from the length and inner diameter of the
tubing used, is swept on the manifold by carrier for reaction and analysis. Refer to
.
Figure 27 Load state
1
Sample loop
4
Waste line/next valve
2
Carrier line
5
Sample line/tubing from adjacent valve
3
To manifold
Содержание QC8500 Series 2
Страница 2: ......
Страница 6: ...4 Table of Contents ...
Страница 10: ...8 Specifications ...
Страница 30: ...28 Installation ...
Страница 52: ...50 Operation ...
Страница 84: ...82 Troubleshooting ...
Страница 88: ...86 Replacement Parts and Accessories ...
Страница 90: ...88 ...
Страница 92: ...90 Warranty ...
Страница 94: ...92 Certification ...
Страница 102: ...100 Ion Chromatography ...