![Hach QC8500 Series 2 Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/hach/qc8500-series-2/qc8500-series-2_user-manual_577110018.webp)
16
Installation
3.1.7 Data system installation
Follow the manufacturer’s instructions for the setup of the computer, keyboard, monitor
and mouse.
For Data Systems purchased from the manufacturer, the Omnion software is installed at
the factory.
For customer-supplied systems, refer to the Omnion User Guide for software
installation instructions.
3.2 Pump installation and power up
3.2.1 Pump installation
To install the pump:
1.
Set the pump on the bench (
and
).
2.
Connect the power cord to the power strip. Leave the power strip switch off.
3.
Connect the power cord to the mains supply socket on the back of the pump
(
).
Figure 11 Flow injection analysis
1
Sample line
6
From manifold outlet
2
Sample loop
7
Manifold configuration varies
3
To manifold inlet
8
Carrier line
4
To waste
9
Waste or next valve
5
Interference filter
Содержание QC8500 Series 2
Страница 2: ......
Страница 6: ...4 Table of Contents ...
Страница 10: ...8 Specifications ...
Страница 30: ...28 Installation ...
Страница 52: ...50 Operation ...
Страница 84: ...82 Troubleshooting ...
Страница 88: ...86 Replacement Parts and Accessories ...
Страница 90: ...88 ...
Страница 92: ...90 Warranty ...
Страница 94: ...92 Certification ...
Страница 102: ...100 Ion Chromatography ...