Operating instructions 36001
Hot-pressing device
PT-55
Page 8 of
19
Edition: 04/0401
Subject to alterations
4.2.
Hot-pressing with guide rail
Plug in the connector cable and preheat the hot-pressing device. Depending upon the power supply
voltage, the preheating time will be approx. 12 (230 V) or 14 minutes (120 V).
The signal lamp (6) lights up while the hot-pressing device is connected.
WARNING
Do not touch the hot-pressing zone (2).
Keep away from water and meltable substances.
Apply adhesive(s) to the prepared (skived) belt/tape ends.
Place
the
belt/tape ends on top of one another and in the center of the appropriate guide rail. Pay
attention to the marked lines (see also section 9).
Place
the covering plate in a position slightly offset (to assist in removal after pressing) and mount the
fixing clamps.
Open
the hot-pressing device by pressing together the handles (5) and place the guide rail in the hot-
pressing device with the prepared belt/tape ends in position.
Close
the hot-pressing device. Make sure that the belt/tape is centered in the hot-pressing device in
order to ensure even pressure distribution.
When the prescribed pressing time has expired, remove the guide rail with the bonded belt/tape and
allow it to cool for a few minutes.
WARNING
After use, disconnect the hot-pressing device from the power supply and allow it to
cool completely before storing it.