Installation Manual
H3C VG 31-08 Voice Gateway
Chapter 3 Installing the VG 31-08
3-9
Caution:
Normally, the startup information is displayed on the terminal screen
after you power on the VG 31-08. For more information, refer to
section 4.1.3 “Startup Process”.
3.9 Verifying Installation
Each time before you power up the VG 31-08 during installation,
verify that:
z
Enough clearance has been reserved around the VG 31-08
for ventilation, and the tabletop/workbench is stable enough.
z
Proper power supply is used.
z
The grounding cable has been correctly connected.
z
The VG 31-08 has been correctly connected to other
devices, such as a console terminal.
Caution:
Installation verification is extremely important, because operations of
the VG 31-08 depend on its stability, grounding, and power supply.