
36
connecting IRF physical ports,
first time access,
grounding,
grounding with grounding conductor buried in
the earth ground,
grounding with grounding strip,
identifying IRF master switch,
identifying IRF member switch physical
ports,
planning IRF cabling scheme,
planning IRF member IDs,
ports,
powering on,
rack-mounting,
setting terminal parameters,
setting up IRF fabric,
technical specifications,
troubleshooting,
troubleshooting the switch,
verifying 19-inch rack installation,
workbench mounting switch,
system administration
troubleshooting configuration terminal
issues,
troubleshooting power failure for switch with
fixed power modules,
system status LED,
T
technical specifications,
10/100/1000 Base-T autosensing Ethernet
port LED,
10/100/1000 Base-T Ethernet port,
100/1000Base-X SFP LED,
100/1000Base-X SFP port,
console port,
LED,
Mode LED,
RPS status LED,
system status LED,
temperature
installation site requirements,
terminal
troubleshooting garbled terminal display,
troubleshooting no terminal display,
tools needed for installation,
topology
planning IRF cabling scheme,
topology (IRF fabric),
troubleshooting
configuration terminal issues,
garbled terminal display,
power failure for switch with fixed power
modules,
switch,
V
verify the IRF fabric setup,
verifying
IRF fabric setup,
switch installation (19-inch rack),
W
workbench
mounting switch,