
35
mounting
workbench mounting switch,
N
network management
setting up IRF fabric,
troubleshooting configuration terminal
issues,
troubleshooting the switch,
networking
planning IRF cabling scheme,
no terminal display (troubleshooting),
P
parity (parameter),
physical port
identifying IRF member switch physical
ports,
planning
IRF cabling scheme,
IRF connections,
IRF member IDs,
IRF topology,
port
100/1000Base-X SFP,
connecting IRF physical ports,
identifying IRF member switch physical
ports,
LED (100/1000Base-X SFP),
setting up IRF fabric,
technical specifications,
power module
cable,
connecting –48 VDC power source,
connecting AC power source,
powering on switch,
preparing for installation,
preventing
EMI prevention,
procedure
configuring IRF basic settings,
connecting –48 VDC power source,
connecting AC power source,
connecting IRF physical ports,
connecting power cord,
grounding switch with grounding conductor
buried in the earth ground,
grounding switch with grounding strip,
grounding the switch,
identifying IRF master switch,
identifying IRF member switch physical ports,
installing switch,
installing switch on 19-inch rack,
maintaining the switch,
mounting switch on workbench,
planning IRF connections,
planning IRF fabric installation site,
planning IRF member IDs,
planning IRF topology,
setting up IRF fabric,
troubleshooting garbled terminal display,
troubleshooting no terminal display,
troubleshooting power failure for switch with fixed
power modules,
troubleshooting the switch,
R
rack
mounting the switch,
switch installation on 19-inch rack,
verifying switch installation (19-inch rack),
RPS
S
safety
grounding the switch,
grounding the switch with grounding conductor
buried in the earth ground,
grounding the switch with grounding strip,
installation site cleanliness,
installation site dust concentration,
installation site gas saturation,
installation site humidity,
installation site temperature,
laser safety recommendations,
recommendations,
setting
IRF fabric,
terminal parameters,
site
dust concentration,
examining installation site,
gas saturation,
IRF fabric installation site planning,
stop bits (parameter),
switch