2-22
Figure2-21 Removing the protection box
2.
Press the spring clip for each ejector lever of the fabric module to release the ejector levers.
3.
Orient the fabric module with the "Up" sign facing up. Align the fabric module with the target slot
and insert it into the slot along the guide rails.
4.
Continue to push the fabric module until the brakes on its ejector levers touch the slot edges
tightly. Press the spring clip and close the ejector lever until the spring clip locks the ejector
levers in place.
Figure2-22 Installing a fabric module
Содержание CR19000-16
Страница 27: ...2 6 Figure2 6 Grounding the router ...
Страница 138: ...11 5 Figure11 6 Routing power cords ...
Страница 146: ...12 7 Figure12 5 Closing the carton ...