24
GVM-VAC
www.gvm-vac.com
Pre-Operating Section
8.
Visual examination of the leaf vacuum frame, suspension and structure
to determine if all components are correctly positioned and secured for
travel.
9.
Check the intake hose boom to verify that it is securely fastened to the leaf
vacuum and can not swing free. (if equipped).
10.
Verify there are no loose tools or materials on the trailer, inside the intake
and exhaust hoses, or inside the engine sheet metal.
11.
Check all cones, wheel-chocks, signs or other support tools and materials
to ensure proper stowage.
2.4 Pre-Transport Checks (continued):
Содержание GVM8000
Страница 46: ...THE 5 0 SERVICE SECTION Service and Troubleshooting Wiring Diagrams SERVICE SECTION www gvm vac com GVM Vac ...
Страница 60: ...60 GVM VAC www gvm vac com Service Section Engine Main Harness 5 10 2 Engine Main Harness Enlarged ...
Страница 67: ...67 GVM VAC www gvm vac com Service Section 5 10 7 Trailer Plug Wiring Diagram ...
Страница 68: ...68 GVM VAC www gvm vac com Service Section 5 10 8 Trailer Wiring Diagram ...
Страница 69: ...69 GVM VAC www gvm vac com Service Section 5 10 9 Brake Wiring Harness ...
Страница 71: ...71 GVM VAC www gvm vac com Service Section 5 10 11 Remote Throttle Clutch Wiring Harness ...
Страница 92: ...92 GVM VAC www gvm vac com 7 5 Kraft Fluid Drive Group Optional Fluid Drive Coupler Optional ...
Страница 93: ...93 GVM VAC www gvm vac com 7 6 Kraft Fluid Drive Installation Optional Fluid Drive Coupler Optional ...
Страница 94: ...94 GVM VAC www gvm vac com 7 7 Kraft Fluid Drive Breakdown Optional Fluid Drive Coupler Optional ...