7.6
Assembling the energy chain
7.6.1
Laying the cables and lines
NOTE
Cable damage
Incorrectly laid cables and lines wear prematurely and will be destroyed. This
results in operational failure.
• Only use highly flexible lines suitable for use with energy chains
• Only use lines whose minimum bending radius is smaller than the smallest
radius of the energy chain
• Güdel shall only be liable for internal divisions which are found in spare
parts lists in the appendix of this manual as a document. If you are laying
your own cables and lines, ensure symmetrical load distribution. Have
IGUS technicians check your own internal divisions of the energy chain
• Roll the cable off evenly. Never take the cables off in loops
Lay out cables without twisting for at least 24 hours before putting them into
energy chains. Use the cable description to assist you. The wires of the cable
are thus aligned without twisting and can have a positive influence on the ser-
vice life of the cable
Observe the following points:
• Cables are separated by vertical dividers; cables are not permitted to be
laid next to each other
• Cables laid over each other with different jacket materials need to be sep-
arated from each other (risk of sticking)
• The vertical dividers are not allowed to be positioned in an offset manner
in the roll-off direction
• The cable must have play on all sides of the cable divider. At its minimum,
it should be 10% of the cable diameter. However, it should not be less
than one millimeter.
Commissioning
OPERATING MANUAL MLB 1-3 V2
881017611_v1.0_
EN-US
65
Содержание MLB 1-3 V2
Страница 4: ...Revision history OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 4 ...
Страница 14: ...Table of contents OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 14 ...
Страница 16: ...Declaration of conformity declaration of incorporation OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 16 ...
Страница 86: ...Operation OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 86 ...
Страница 159: ...9 4 Maintenance schedules Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 159 ...
Страница 160: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 160 ...
Страница 162: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 162 ...
Страница 164: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 164 ...
Страница 166: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 166 ...
Страница 170: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 170 ...
Страница 172: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 172 ...
Страница 174: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 174 ...
Страница 176: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 176 ...
Страница 178: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 178 ...
Страница 180: ...Maintenance OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 180 ...
Страница 206: ...Repairs OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 206 ...
Страница 212: ...Decommissioning storage OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 212 ...
Страница 217: ...13 Spare parts supply Spare parts supply OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 217 ...
Страница 218: ...Spare parts supply OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 218 ...
Страница 224: ...Spare parts supply OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 224 ...
Страница 234: ...List of illustrations OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 234 ...
Страница 238: ...List of tables OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 238 ...
Страница 246: ...Index OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US 246 ...
Страница 248: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 249: ...Hazard analysis Risk analysis Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 250: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 254: ...Addition to declaration of incorporation Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 255: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 258: ...Technical data Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 259: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 260: ...Layout Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 261: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 262: ...Spare parts lists Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 263: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 264: ...Options Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 265: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 266: ...Third party documentation Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 267: ...Appendix OPERATING MANUAL MLB 1 3 V2 881017611_v1 0_EN US ...
Страница 282: ...GÜDEL AG Industrie Nord CH 4900 Langenthal Switzerland Phone 41 62 916 91 91 info ch gudel com www gudel com ...