Issue 07/2011
Page 30
Bu
ilt
-in g
en
er
at
or
s w
ith s
w
itch c
ab
in
et f
or p
er
m
an
en
tly i
ns
ta
lle
d p
ow
er g
en
er
at
io
n s
ys
te
m
s ≥ 1
2 k
VA i
n fi
re e
ng
in
es
Installation of generator
Permissible installation positions
3.4
Permissible installation positions
The generator must be monitored on
a horizontal surface
standing on the
attachment brackets
as shown.
In the normal installation position, the terminal
box is positioned on the top side of the
generator.
The generator can be installed rotated by
45° or 90° to the left or right, as shown in the
accompanying image. Remove the attachment
bracket and install in the corresponding
mounting profiles.
>
Replace the screws with screws of the same
grade.
Replacement screws of the same quality are
supplied by GTS.
>
The screws must be tightened to the correct
torque.
y
Torque 25 Nm for grade 8.8
y
Torque 35 Nm for grade 10.9
Other installation positions are not permitted.
OK
OK
OK
Содержание DWG (BL) 13/7-2 ZE
Страница 87: ...Page 87 Issue 07 2011...