20
GPX-SL25 Instruction Manual
rev 03.21.13
DUAL GATE SYSTEM INSTALLATION
(4) 3/8”-16 x 2” diameter U-Bolts
and (8) 3/8” Serrated Nuts
(2) Quick Release Pins
(2) Chain Master Links
(3) 1/4”-20 x 1/2”
Nylon Thumb Screws
(2) Chain Brackets
(204IH)
Operator Housing
(R4966)
25’ Drive Chain
(RB207)
60’ Power Cable
w/Strain Relief
Second Gate
Operator
Battery
(4)
Zip Ties
Install the second gate operator in the same manner as the Single gate operator starting on page 14 of
this manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next
two pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order
in which the gates open (“sequencing”). Setting the Control Board for Dual Gate Installations begins
on page 23.
Second Gate (Auxiliary) Operator
Parts & Hardware
(R4677)