GPX-SL25 Instruction Manual
23
rev 03.21.13
DIP Switches
The Control Board DIP switches must be set to accommodate your particular type of installation. Since the
SNGL / DUAL, SEQ1, and SEQ2 DIP switches are used by dual gate operator systems, they will be discussed
in the following steps.
Step 4
Make sure the control box power switch is OFF.
Step 5
Unscrew and remove the control box cover. Use a small
screwdriver to move the SNGL / DUAL DIP switch to DUAL
(
see illustration
).
Step 6
Turn power ON.
NOTE:
If the DIP switches are adjusted with the unit on - it
will not recognize the change until the unit is turned off
then back on.
NOTE:
Use of a surge protector is strongly recommended.
CONTROL BOARD SETTINGS FOR DUAL INSTALL
SEQ1
SEQ2
ON
OFF
Open & Close Simultaneously
ALWAYS USE THIS FOR SLIDE GATE
1234
ON
OBSTRUCT
SENS.
PULL/PUSH
SEQ1
SNGL/DUAL
SEQ2
MIN
MAX
LEARN
VOLTAGE READINGS
18 Vac Transformer
18.0 to 22.0 Vac
10 W Solar panel (single)
18.0 to 22.0 Vdc
In FULL SUN
— measure voltage with the Solar Panel Disconnected.
12 V, 7 amp hour Battery
12.5 to 13.5 Vdc
Measure voltage at battery terminals with battery disconnected
Charging circuit
12.0 to 14.8 Vdc
Measure voltage at battery terminals with battery connected