GSi PNEG-902 Скачать руководство пользователя страница 4

4

   

PNEG-902 

Multi - Module Dryer Stacking

1. Safety

Safety Guidelines

This manual contains information that is important for you, the owner/operator, to know and understand. 
This information relates to protecting

 personal safety 

and 

preventing equipment

 

problems

. It is the 

responsibility of the owner/operator to inform anyone operating or working in the area of this equipment 
of these safety guidelines. To help you recognize this information, we use the symbols that are defined 
below. Please read the manual and pay attention to these sections. Failure to read this manual and its 
safety instructions is a misuse of the equipment and may lead to serious injury or death.

This is the safety alert symbol. It is used to alert you to 
potential personal injury hazards. Obey all safety 
messages that follow this symbol to avoid possible 
injury or death.

WARNING

 indicates a potentially hazardous situation 

which, if not avoided, could result in death or serious injury.

CAUTION

 indicates a potentially hazardous situation which, 

if not avoided, may result in minor or moderate injury.

CAUTION 

used without the safety alert symbol indicates a 

potentially hazardous situation which, if not avoided, may 
result in property damage.

NOTE

 indicates information about the equipment that you 

should pay special attention to.

DANGER

 indicates an imminently hazardous situation 

which, if not avoided, will result in death or serious injury.

Содержание PNEG-902

Страница 1: ...PNEG 902 Multi Module Dryer Stacking Review of Stacking a Dryer Installation Manual PNEG 902 Date 07 26 07...

Страница 2: ...2 PNEG 902 Multi Module Dryer Stacking...

Страница 3: ...king a Network Dryer 7 Chapter 3 Module Preparation and Installation 8 Crane Bracket Placement 9 Setting Lower Module on Pedestals 10 Anchoring Lower Module to Foundation 11 Installing Support Legs 12...

Страница 4: ...suse of the equipment and may lead to serious injury or death This is the safety alert symbol It is used to alert you to potential personal injury hazards Obey all safety messages that follow this sym...

Страница 5: ...owed in all cases Authorities having jurisdiction should be consulted before installations are made Follow Safety Instructions Carefully read all safety messages in this manual and safety signs on you...

Страница 6: ...Hat Install and Operate Electrical Equipment Properly Electrical controls should be installed by a qualified electrician and must meet the standards set by the National Electrical Code and all local a...

Страница 7: ...G 902 Multi Module Dryer Stacking 7 2 Stack Dryer Component Callout Stacking a Network Dryer The following information is intended to help outline the steps required in stacking a Network Dryer Figure...

Страница 8: ...Chapter 4 of this manual See PNEG 1273 for reference Raise the top auger to its installed position Install the wet bin side panels and attach them to the top auger housing Install the pulleys belts an...

Страница 9: ...s will vary with model number The module should remain parallel to the earth as it is lifted Figure 3A Top Module Crane Brackets Top modules utilize two 2 crane brackets with four 4 lifting points and...

Страница 10: ...h the base module in position bolt a pedestal to each stiffener base connector clip using 3 8 16 x 1 1 2 bolts S 7928 See Figure 3D Figure 3D Figure 3E 3 With a stiffener splice SS 7053 splice the ped...

Страница 11: ...was poured drill holes in the foundation to accept anchor bolts use 3 4 x 9 5 8 minimum anchors with epoxy resin See Figure 3I and Figure 3J GSI has 1 x 12 anchor bolts Part S 8957 tubes of epoxy GTC...

Страница 12: ...he support leg and dryer frame On the right side it may be necessary to remove the cotter pin and slide the clean out door pivot rod forward enough to insert the top bolt See Figure 3L Figure 3L 8 Use...

Страница 13: ...s S 2120 and nuts S 6493 as shown in Figure 3N Figure 3N 10 Lift upper module and move into place over lower module Use a guide line to keep module steady while it is being moved See Figure 3O Figure...

Страница 14: ...as a tab that extends below module frame This tab will slide into the lower module just behind the plenum end panel See Figure 3P Figure 3P 12 When the upper module is set in place and the crane is be...

Страница 15: ...le bracket of the lower module to the frame tie channel of the upper module There may be a small gap between these two parts if so the 5 16 bolts connecting the top angle bracket to the lower module c...

Страница 16: ...nal standards and regulations relevant to your country and region A mains power isolator should be installed with the stack dryer unit and is essential for your safety This should be installed as indi...

Страница 17: ...5A Figure 5B and Figure 5C 2 Use five 5 44 safety cage vertical supports LS 4353 and connect the small and large bell hoops assembled in the Step 1 using 5 16 18 x 3 4 bin bolts S 275 and 5 16 18 nuts...

Страница 18: ...y seven 7 of the 44 safety cage vertical supports LS 4353 See Figure 5D 5 Assemble eight 8 small hoop halves to make four small safety cage hoops Connect these hoops together with five 5 34 vertical s...

Страница 19: ...PRODUCTS GSI SHALL NOT BE LIABLE FOR ANY DIRECT INDIRECT INCIDENTAL OR CONSEQUENTIAL DAMAGES INCLUDING WITHOUT LIMITATION LOSS OF ANTICIPATED PROFITS OR BENEFITS PURCHASER S SOLE AND EXCLUSIVE REMEDY...

Страница 20: ...gulations which should be carefully followed in all cases Authorities having jurisdiction should be consulted before installations are made GSI Group 1004 E Illinois St Assumption IL 62510 0020 Phone...