3. Module Preparation and Installation
PNEG-902
Multi - Module Dryer Stacking
11
Anchoring Lower Module to Foundation
4. Set the lower module into final position and check
level. Use shims (SS-6953) to level lower module if
needed.
and
Figure 3G
Figure 3H
5. Anchor lower module to foundation. If anchor bolts
were not set when the concrete was poured, drill
holes in the foundation to accept anchor bolts (use
3/4" x 9-5/8" minimum anchors with epoxy resin).
and
GSI has 1" x 12"
anchor bolts (Part # S-8957), tubes of epoxy
(GTC-0004) and mixing nozzles for epoxy tubes
(GTC-0005). An epoxy gun will be needed.
Figure 3I
Figure 3J
6. Attach front (BLK-10058) and back (BLK-10057)
leg anchor plates to legs using 5/16"-18 x 3/4" bolts
(S-6606) and 5/16"-18 nuts (S-3611)
as shown in
.
Figure 3K
Shims
Base Length
No.of anchors needed
14' 18'
20'
22'
26'
16
20
22
24
28
Leg stand
BLK-10058
BLK-10057
Содержание PNEG-902