![GSi PNEG-765 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/gsi/pneg-765/pneg-765_installation-manual_2275075010.webp)
3. Installation
10
PNEG-765
In-Line Intermediate Discharge Gates
Manual Gate Installation
Manually Operated Gate
1. Install the specified wheel to the shaft by aligning the key and key way, then tighten the set screw.
This gate can be operated by a chain, cable or hand wheel.
2. Manual gates up to 16" wide are fitted with a single rack. Manual gates larger than 16" wide have a
double rack.
3. The slide gate plate rides on 1-3/8" double shielded radial bearings for smooth operation.
Figure 3C
Ref #
Description
A
Hand Wheel
B
Key
C
Shaft
D
Gate Frame