
10. 2.66" Commercial Tank Accessories Installation
66
PNEG-1859
2.66" Corrugation 135' Diameter Tank with 50 PSF Snow Roof
Installation
7. If the roof sheet does not have a pre-punched hole for the roof vent, a hole must be cut. Cut the hole
to match the roof vent. The inside edge of the hole should be approximately 15" from the eave.
8. Place the three (3) foam strips on roof sheet, as shown in
. Position roof vent over foam
strips and bolt down using 5/16" x 1" bin bolts and nuts.
NOTE
:
for lower two (2)
bolts of vent
.
Figure 10E
Figure 10F
Figure 10G