4. Electric Operated Gate Installation
PNEG-1993
CE Compliant E-Series Chain Conveyors - All Models
37
Flipping the Shaft to Change Gate Drive Side
1. Loosen set screws (A) for shaft on both bearings.
2. Remove bearing on the long side of the shaft (B).
3. Flip shaft (B) and re-install bearing (C).
4. Tighten set screws (A) on shaft.
5. On guard move filler plate to opposite side if applicable.
6. If gate will be electronically operated, install motor mount on appropriate side for gearbox and motor.
Figure 4H
Ref #
Description
A
Set screw
B
Shaft
C
Bearing
NOTE: The limit switch and cover
is not shown for more clarity.