3. Installation
28
PNEG-1993
CE Compliant E-Series Chain Conveyors - All Models
Chain Installation
Figure 3K Chain Travel Direction (Bottom Run)
1. Assemble and install in 5 m sections.
2. 1.5 m section used to adjust final length.
Ref #
Description
A
Direction of Chain Travel Bottom Run