8. Product introduction

8.1 Product description

Grundfos pumping stations are pre-fabricated pumping stations 
for collection and pumping of wastewater.
The pit is made of PE-HD (polyethylene) and comes with outlet 
pipes and valves fitted.
The pipes are made of PE or stainless steel depending on the 
location of the pit and the pumped liquid, and thus the pump 
selected.
Wastewater is led into the pit. When the liquid in the pit reaches 
the maximum liquid level, the pump will start and pump the liquid 
further on into the sewer system.

Fig. 21

Example of pumping station

8.2 Applications

Grundfos pumping stations are used for collection and pumping 
of drainage water, grey wastewater and sewage. The pump type 
depends on the pumped liquid.

8.3 Pumped liquids

8.3.1 Liquid temperature

Maximum 40 °C. For higher temperatures, contact Grundfos.

8.3.2 Acids and alkalis

The pumping station is resistant to strong acids and alkalis as 
well as solvents. 
The pumps are supplied with the pump pit and normally capable 
of withstanding pH values between 4 and 10. In case of doubt, 
please contact Grundfos.

8.3.3 Viscosity

Very thick wastewater must not be led into the pit. See also the 
installation and operating instructions for the pump.

8.3.4 Density

Maximum 1100 kg/m

3

.

8.4 Pumping station system (PS.S)

This section applies only to pumping station systems consisting 
of Grundfos-approved components mentioned on the nameplate 
of PS.S.
The pumping station system contains all the elements making the 
pumping station function as one unit, and can contain the 
following five elements:
• pit
• pump
• pump controller
• level controller
• accessories.
The pumping station system may not always have all five 
elements. However, it will always have a pit and a pump, but the 
pump controller or the level controller may be incorporated in the 
pump, and/or accessories may be omitted.

8.4.1 CE approval of PS.S

PS.S is CE approved in accordance with these directives and 
standards:
• EN 2006/42/EC, EU Machinery Directive
• EN/ISO 12100, Safety of machinery - General principles for 

design - Risk assessment and risk reduction.

In order to ensure safe transport and to fulfil customer requests, 
the PS.S elements can be assembled on site. But the CE 
approval of PS.S is only valid if the following conditions have 
been fulfilled: 
• PS.S has been assembled correctly in accordance with the 

installation and operating instructions for PS.S and the pit, 
pump and control systems.

• PS.S contains the Grundfos specified elements stated on the 

PS.S nameplate. The PS.S nameplate is fitted inside the pit.

8.5 Pumping station modular (PS.M)

PS.M is used instead of PS.S when the CE approval for the 
complete system is not needed or some of the components in the 
pumping station, e.g. the controllers, are not supplied by 
Grundfos.
A risk assessment for the complete system must be performed by 
the customer, if necessary.

TM

02

 93

63

 24

04

Pos.

Description

1

Pump

2

Chain

3

Guide rails

4

Float  switch

5

Non-return valve

6

Isolating valve

7

Flange/coupling

8

Connection, 1/2" internal thread

9

Cover

9

7

6

4

2

1

8

5

3

Select the pump on the basis of knowledge of the 
liquid temperature. See the installation and operating 
instructions for the individual pumps.

Содержание PS.R Series

Страница 1: ...Pumping station systems PS R 05 17 Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...e transducer 11 6 7 Other types of level control equipment 11 7 Electrical connection 11 7 1 Installing the cables 11 8 Product introduction 12 8 1 Product description 12 8 2 Applications 12 8 3 Pumpe...

Страница 3: ...s personal injury Before starting any work on the product make sure that the power supply has been switched off and that it cannot be accidentally switched on DANGER Crushing and suffocation hazard De...

Страница 4: ...customer The inspection must include the following Check the pumping station for transport damage Contact the transporter immediately if you detect any damage Check that the products delivered corresp...

Страница 5: ...ble and composed so that neither its properties nor the compaction will cause damage to the pit Grains larger than 16 mm must not be present The content of grains between 8 and 16 mm must not exceed 1...

Страница 6: ...corresponding to approx 20 cm after compaction Fig 6 Insufficient compaction under pipes Do not use plate compactors at a distance of less than 30 cm from the pit wall TM06 3602 0615 TM06 3603 0615 D...

Страница 7: ...sing soil volume The sand volume resting on the pit s shoulder is a stabilising force The sand volume is determined as a cone with hollow core as illustrated in fig 7 The inclination of the cone is il...

Страница 8: ...e to the circular pit shape the pilot drill must extend beyond the cutting edge of the hole saw by at least 23 mm The position of the hole is not an issue See fig 11 Fig 11 Drilling from the inside We...

Страница 9: ...pumps on auto coupling we recommend that you fit the chain in the foremost lifting eye of the lifting bracket The number of lifting eyes depends on the pump Fig 15 Chain fitted to the pump As it must...

Страница 10: ...installation and operating instructions for the level switch selected 6 1 Start and stop levels The effective volume of the pit must be so large that the number of starts does not exceed the maximum...

Страница 11: ...lectrical connection See the installation and operating instructions for the pump and the pump controller 7 1 Installing the cables The cables for the level switches and the pump s can be led into the...

Страница 12: ...mping station function as one unit and can contain the following five elements pit pump pump controller level controller accessories The pumping station system may not always have all five elements Ho...

Страница 13: ...M Modular system Pit material R Rotation moulded PE G Glass fibre reinforced plastic Pit sump diameter mm x 100 05 500 mm 08 800 mm 10 1000 mm 12 1200 mm 17 1700 mm Pit depth mm x 100 25 2500 mm Pump...

Страница 14: ...mp diameter mm x 100 05 500 08 800 10 1000 12 1200 17 1700 Pit depth mm x 100 25 2500 S One pump D Two pumps Pipe design DC Direct outlet common GC Goose neck common VC Valve chamber Pipe material and...

Страница 15: ...e pit according to local regulation All work in pits must be carried out according to local regulations and supervised by at least one person outside the pumping station When work is going on in or in...

Страница 16: ...If it is not possible to dispose of the product as a complete unit the pump and installation equipment can be removed from the pit and the pit can be filled and covered See also end of life informati...

Страница 17: ...fos Pumpstationen anlage vom Typ PS S Diese ist mit der CE Kennzeichnung auf dem Typenschild gekennzeichnet Voraussetzung f r die G ltigkeit der Erkl rung ist dass die Pumpstationenanlage zu jeder Zei...

Страница 18: ...h i zatwierdzonych przez Grundfos element w i produkt w wymienionych na tabliczce znamionowej My Grundfos o wiadczamy z pe n odpowiedzialno ci e nasza przepompownia typu PS S kt rej deklaracja niniejs...

Страница 19: ...mmelse och eller EG f rs kran om kompo nenters och produkters prestanda finns i monterings och driftsinstruktio nen som medf ljer dessa komponenter och produkter TR PS S tipi Grundfos pompa istasyonu...

Страница 20: ...ST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 2020 153032 1 4859 016 59379130 2011 KAZ PUST 1 2 3 PUST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 202...

Страница 21: ...TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 2020 153032 1 4859 016 59379130 2011 ARM PUST 1 2 3 PUST 004 2011 010 2011 020 2011 TC RU C DK 30 01435 13 03 2020 TC RU C RU 30 01416 09 03 20...

Страница 22: ...5 NOT RELEVANT 6 System or systems of assessment and verification of constancy of performance of the construction product as set out in Annex V System 3 7 In case of the declaration of performance co...

Страница 23: ...428 5005 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA GRUNDFOS Pumps Latvia Deglava biz...

Страница 24: ...0941 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos Holding...

Отзывы: