6.8. BMQE pumps connected in parallel
6.8.1.

  When  connecting  BMQE  pumps  in  parallel  as 

shown in fig. 5, 

a separate EZ Boost controller must be used 

on each BMQE

. Set the pressure on one BMQE 10 PSI lower 

than the other. 

6.8.2.

  For  BMQE  pumps  connected  in  parallel,  mounted 

above each other, it is recommended to connect the pipes 
as  shown  in  fig.  5.  This  layout  ensures  that  the  BMQE 
pumps are filled with water before starting.   

     Fig. 5  Booster unit with two BMQE pumps   
 

 

connected in parallel, mounted above each 

 

 

other.

6.8.3.  Notes:

•  All  BMQE  modules  are  supplied  with  a  non-return  
 

valve.

•  BMQE  modules  connected  in  parallel  may  also  be  
 

installed vertically.

•  As venting problems may arise in such installations, it is 
 

advisable to install suitable air vent devices.

•  The BMQE should be positioned with the discharge and 
 

air vent at the top when installed vertically.

•  When the maximum flow for BMQE pumps in parallel  
 

will  exceed  35  GPM,  a  4-gallon  or  two  2-gallon  dia- 

 

phragm tank(s) should be used.

6.9. Generator Operation

Power may be supplied to BMQE pumps by an adequately 
sized  generator.  The  generator  must  be  sized  50%  above 
the pumps P1 (input power) values. See following chart.

Motor HP

Minimum 
generator 

size

Recommended 

generator 

output (watts)

0.33 to 0.50 A

1100

1500

0.50 to 0.75 B

1700

2300

1.0 to 1.5 B

2000

3500

7. Operation
7.1.  Starting  the  BMQE  Pump  for  the  First 
Time

When  the  BMQE  has  been  connected  correctly,  it  should 
be  started  with  the  discharge  valve  closed  approximately 
one-third.    Due  to  the  soft  start  feature,  the  pump  takes 
approximately 2 seconds to develop full pressure.

Check that the actual inlet pressure is equal to or greater 
than the previously estimated inlet pressure. 

When  not  being  used,  all  modules  should  be  filled  with 
water as all internal bearings are water lubricated.

If the BMQE is taken out of operation for a long period, the 
BMQE  should  be  flushed  through  with  clean  water.  The 
modules are then left with clean water until they are to be 
used again.

7.2. EZ Boost Controller Operating Functions
7.2.1 On/off button

Fig.6 shows the on/off button of the EZ Boost controller.

   Fig. 6

9

Содержание EZ Boost

Страница 1: ...GRUNDFOS INSTRUCTIONS EZ BoostTM System USA Installation and operating instructions Please leave these instructions with the pump for future reference...

Страница 2: ...a Operating Conditions 6 Storage 6 Frost Protection 6 6 Installation Electrical Connection 6 Cable Sizing 7 Positioning 7 Controller Connection 7 Pressure Sensor 8 Pressure Tank 8 Pressure Relief Valv...

Страница 3: ...e controller adjusts the pump performance accordingly to maintain constant pressure by changing the pump speed At low flow the pressure will drop slowly When the pres sure in the tank is 7 PSI below t...

Страница 4: ...V or rises above 280 V With a rated voltage of 110 115 V 60 Hz the pump will be cut out if voltage falls below 75 V or rises above 150 V The motor is automatically cut in when the voltage is again wi...

Страница 5: ...am The EZ Boost Constant Pressure System should consist of Pos 1 EZ Boost BMQE pump 2 EZ Boost controller 3 Diaphragm tank recommended size 2 U S gallons 8 liter 130 psi 2 3 4 1 5 6 6 Additional boost...

Страница 6: ...and when installed in the vertical position the air vent must be at the top of the unit Insert BMQE pump into the open mounting bracket Secure mounting brackets Apply pressure to the BMQE pump until t...

Страница 7: ...Consult Troubleshooting Section 11 Verify that EZ Boost controller is operating 11 Verify EZ Boost controller is operating These lights are on These lights are on 12 Optional Lock the buttons 12 Opti...

Страница 8: ...f button on the EZ Boost con troller must not be used as a safety switch when installing and servicing the pump Rain tight or wet location hubs that comply with the requirements in the standard for Fi...

Страница 9: ...System 6 1 2 Cable sizing Single phase 60 HZ maximum cable length motor service to entrance Motor rating Copper wire size AWG Volts HP 14 12 10 Maximum cable length ft m 115 0 50 100 30 5 160 48 8 250...

Страница 10: ...signed to work with a 2 gal diaphragm tank Install a diaphragm tank to insure that the BMQE will shut off at zero flow The diaphragm tank must be installed at some point between the BMQE pump and the...

Страница 11: ...um flow for BMQE pumps in parallel will exceed 35 GPM a 4 gallon or two 2 gallon dia phragm tank s should be used 6 9 Generator Operation Power may be supplied to BMQE pumps by an adequately sized gen...

Страница 12: ...on the EZ Boost controller face the pipe shows run lights when the pump is operat ing When the pump is not operating none of the flow indicator lights are on see fig 7 Fig 7 7 2 3 Pressure setting Th...

Страница 13: ...d pressure drops causing the motor to increase speed If the power consumption falls below the dry run setting for an accumulated time of 5 seconds and the motor speed is within 1000 rpm of the max spe...

Страница 14: ...eed Sensor defective Overload Over temperature Speed reduction Voltage alarm No contact to pump see Fig 14 Flashing green light when the pump control is working correctly Permanent yellow light when t...

Страница 15: ...2 Parts list for SQE with instructions for dismantling and assembly of pump and motor 8 2 EZ Boost Controller Service Before starting any work on the EZ Boost con troller make sure that the electricit...

Страница 16: ...and repair replace the pump e Leakage in the pipe work Check and repair the pipe work f Under voltage has occurred Check the electricity supply 4 Frequent starts and stops a The supply voltage is unst...

Страница 17: ...sure sensor If the pump has not started yet proceed as follows Press the on off button for 5 seconds If the pump starts the EZ Boost controller or the sensor may be defective Note The pressure is not...

Страница 18: ...motor communication part is defective Reduce the length of the pump cable Switch off the main power supply to the EZ Boost controller Switch on the main power supply again The pump is now connected d...

Страница 19: ...ording to the values in Section 5 Note As the voltage is detected at the motor allow for the voltage drop in the pump cable 8 The EZ Boost controller indicates Dry running If the power consumption is...

Страница 20: ...ed Replace pump or motor 13 The EZ Boost controller indicates Sensor defective a The pressure sensor is defective Check that the sensor is wired correctly If the sensor type is 4 20 mA measure the DC...

Страница 21: ...faults Poor connection in leads possibly in the cable joint Too low supply voltage see item 1 9 Factory settings Alarm 200 240 V motors 100 115 V motors SQ SQE SQE NE 03A and 05A models SQ SQE SQE NE...

Страница 22: ...4 54 7 8 0 95 2 2 9 15 0 5 5 55 5 8 1 96 0 2 9 15 7 5 5 56 2 8 1 96 7 3 0 16 5 5 6 57 0 8 2 97 5 3 0 17 2 5 6 57 7 8 2 98 2 3 1 18 0 5 7 58 5 8 3 99 0 3 1 18 7 5 7 59 2 8 3 99 7 3 2 19 5 5 8 60 0 8 4...

Страница 23: ...ce under this warranty the defective product must be returned to the distributor or dealer of GRUNDFOS products from which it was purchased together with proof of purchase and installation date failur...

Страница 24: ...Road Oakville Ontario L6H 6C9 Telephone 905 829 9533 Fax 905 829 9512 Bombas Grundfos de Mexico S A de C V Boulevard TLC 15 Parque Stiva Aeropuerto Apodaca N L 66600 Mexico Telephone 52 81 8144 4000 F...

Отзывы: