![GrowSpan 113577 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/growspan/113577/113577_manual_2270674009.webp)
9
Revision date: 12.17.14
1
Assembly Instructions
9. After attaching the ribbon board, secure the 2' section of film (sent with the kit) between the 111613Z144 and the u-channel attach to the side of the
building used for the main cover and/or roll-up sides. Use the 102198 spring wire sent with the kit for both connections. Install the 2' film and spring wire
over the roll-up side panel if panel is installed. U-channel supplied with the building may be single or double. Single is shown below.
10. With the film installed, attach the vinyl gutter brackets (113623)
over the film
and to the ribbon board using the FA4652 wood screws.
Building Cover
*Secure 2'
film in channel
using *102198
spring wire.
*Secure 2' wide film
in building u-channel
using 102198 spring
wire from kit.
*2' wide film
Secure
building cover
in this channel
using 102198
spring wire.
*Secure 2' wide film
in building u-channel
using 102198 spring
wire from kit.
Building Cover
*Secure 2'
film in channel
using *102198
spring wire.
*2' Wide
Film
*113623 bracket to
board using *FA4652
wood screws. Remove
washers from screws if
needed.
Secure
building cover
in this channel
using 102198
spring wire.
*Included with
rainwater catch
drain kit.
RAINWATER CATCH DRAIN INSTALLATION (continued)
*Included with
rainwater catch
drain kit.