![GrowSpan 113577 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/growspan/113577/113577_manual_2270674010.webp)
10
10
Revision date: 12.17.14
1
Assembly Instructions
11. Next, secure the main roof cover material to the upper channel of the installed 111613Z144.
Do not trim the excess roof material. The free edge of the
cover will be anchored inside the gutter in Procedure 2.
12. Beginning at the high end of the gutter, slide or snap the 113622 gutter sections onto the gutter brackets. Position high end flush with the outer edge of the
building rafter. Use the 113624 connectors to join each 10' section and glue each connection using the 113628 cement.
Secure
building cover
in this channel
using 102198
spring wire.
Secure cover
in u-channel
using 102198
spring wire.
Free end of cover
is placed inside
the gutter once
gutter is fully
installed.
113622
Gutter
Single u-channel attached to each end
rafter. Included with the building.
RAINWATER CATCH DRAIN INSTALLATION (continued)