GrowSpan 113577 Скачать руководство пользователя страница 2

    

2

Revision date: 12.17.14

READ THIS DOCUMENT BEFORE YOU BEGIN

Thank you for purchasing this rainwater catch drain system. When properly assembled and maintained, this system will provide years of reliable service. This 

guide includes information needed to safely assemble and maintain the system. Read these instructions 

before

 you begin. 

Important Information

REQUIRED TOOLS

The following list identifies the main tools needed 

to assemble the system. 

Additional tools and 

supports may be needed.

•  Tape measure and marker
•  Variable speed drill to drive Tek screws
•  Transit, string line, or chalk line
•  Tool to cut film material

CUSTOMER-SUPPLIED MATERIALS REQUIRED

To properly attach the gutters of this rainwater 

catch drain system to the frame, a 1" x 4" ribbon 

board must first be installed. This board runs the 

length of the building. 

For systems that use a reservoir to collect water 

at the end of the gutter, extend the ribbon board 

beyond the building frame to provide a surface 

to mount the gutters. See pages 4 & 11 for an 

example.

Customer is responsible for supplying the 

materials for the ribbon board.

  

Recommended lumber: Treated 1" x 4" boards 

purchased locally.

ASSEMBLY PROCEDURE 

This manual describes how to install the 

rainwater catch drain system. 

The steps outlining 

the process are as follows:
1.  Unpack the contents of the shipment and 

place where you can easily inventory the 

parts. Refer to the Bill of Materials/Spec 

Sheets.

2.  Verify that all parts listed on the Bill of 

Materials/Spec Sheets are present. If 

anything is missing or you have questions, 

consult the Pictorial Parts Guide and 

all diagrams for clarification, or contact 

Customer Service.

3.  Read and understand these instructions and 

all additional documentation included with 

the shipment 

before

 you begin.

4.  Gather the required tools. 
5.  For best results, assemble the components 

in the order they are presented in these 

instructions.

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear gloves when handling system parts.
•  Use a portable GFCI (Ground Fault Circuit 

Interrupter) when working with electric power 

tools and cords.

ABOUT THIS RAINWATER CATCH DRAIN KIT

This kit includes the parts needed to attach the system to high tunnels and greenhouses with roll-up or drop-down sides and covered with film or 5.2 oz 

material. It is 

not designed

 for use on any building with polycarbonate sides or roof coverings. Consult with your sales representative if the cladding for your 

building is something other than film or 5.2 oz material.

New Building:

 If you have purchased this kit to install on a building that 

has not been constructed

, read this guide and the instructions included with the 

building to determine the best way to proceed. In most cases, it is best to first assemble the building frame and then to install this kit 

before you install 

the roof 

covering. Additionally, install any roll-up or drop-down side components after installing the components in this rainwater catch drain kit. 

Existing Building: 

To install this system on an existing building with a film or 5.2 oz cover, it will be necessary to partially loosen the lower edge of the roof 

covering. 

Do not attempt to install this system on windy days or when such conditions are expected.

 Doing so may cause extensive damage to the 

roof film, building, and building contents and may cause personal injury.

Содержание 113577

Страница 1: ...rame 113578 48 Rainwater Catch Drain for 48 Long Frame 113579 60 Rainwater Catch Drain for 60 Long Frame 113580 72 Rainwater Catch Drain for 72 Long Frame 113581 96 Rainwater Catch Drain for 96 Long F...

Страница 2: ...t the Pictorial Parts Guide and all diagrams for clarification or contact Customer Service 3 Read and understand these instructions and all additional documentation included with the shipment before y...

Страница 3: ...sition on the building frame NOTE Install the 113074 brackets when the curve of the rafter is too great to allow for the installation of customer supplied 1 x 4 boards Brackets help to plumb the board...

Страница 4: ...dditional purchase required is typically installed at the drain end of the gutter to store water Gutter slopes throughout its length to ensure proper drainage 111613Z144 Reservoir additional purchase...

Страница 5: ...113074 bracket using FA4484B Tek screws Countersink screws for best results Ribbon board and u channel for drop down or roll up side panel See main building instructions if applicable Free end of cove...

Страница 6: ...g FA4482B Tek screws Ribbon board and u channel for drop down or roll up side panel See main building instructions to install Single u channel is shown Depending on building design double u channel ma...

Страница 7: ...ee diagrams on previous page For best results mount the gutter 3 4 above the ribbon board for the drop down and roll up sides 7 Move to the low end and mark end rafter to set the required slope Snap a...

Страница 8: ...Sample Frame without 113074 Bracket Attach ribbon board directly to rafter If rafters are straight where the gutter will be installed 113074 brackets are typically not used Attach customer supplied 1...

Страница 9: ...gutter brackets 113623 over the film and to the ribbon board using the FA4652 wood screws Building Cover Secure 2 film in channel using 102198 spring wire Secure 2 wide film in building u channel usin...

Страница 10: ...gutter sections onto the gutter brackets Position high end flush with the outer edge of the building rafter Use the 113624 connectors to join each 10 section and glue each connection using the 113628...

Страница 11: ...osition and seal with the 113628 cement Install the end cap and glue in place using the 113628 cement 14 Return to the high end of the gutter and install that end cap Glue in place 15 Continue by secu...

Страница 12: ...nd around gutter bracket 2 Use a utility knife or similar tool to make a cut at the first gutter bracket Cut to the edge of the cover 5 Repeat the steps to cut the cover at each gutter bracket When co...

Страница 13: ...e gutter 8 Take one 109108 fiberglass stake and beginning at one end thread the stake through the slits in the cover 11 Make additional cuts as needed when adding stakes or custom fitting the stakes i...

Отзывы: