background image

GROWSPAN

 ROUND PREMIUM GREENHOUSES

32

106201_02_03_04

 

Revision date: 01.10.19

SPECIAL NOTE ABOUT BASEBOARD INSTALLATION

BASEBOARD INSTALLATION (RECOMMENDED)

Gather parts:
•  Treated or recycled plastic lumber (supplied by 

customer)

•  1/4" x 4" Carriage Bolts and 1/4" Nuts (included)

 

 

The procedure (next column) shows one way to install 

baseboards. Size and type of baseboard chosen may 

require alternative steps. When properly installed, 

baseboards run the length of frame on the outside.  

 

Set boards at ground level or slightly into grade to prevent 

shelter from sinking and to create a seal along bottom. 

ATTENTION:

 Skip this section if you are not installing 

baseboards. Continue with procedure on next page.

ATTENTION:

 Never attach two boards to the same ground 

post. 

All baseboard splices should be between rafters as 

shown above.

Use a short section of baseboard to secure separate 

baseboards at a splice. 

Customer supplies all materials 

to secure all baseboard splices.

Ground 

Level

Outside of 

Shelter

After installing all panels, installing baseboards is 

strongly recommended. 

Minimum size is 2" x 6". 

Length determined by building length. Materials for 

baseboards are supplied by the customer.  

 

Fasteners to secure baseboards to frame are included 

with building.

A baseboard (2" x 6" minimum) protects the lower section 

of all panels. In addition, baseboards help keep ground 

posts properly seated after anchors are installed. Consult 

the following information before installing baseboards. 

Install baseboards after all panels are installed. 

Install baseboards after all panels are installed. General 

installation steps:
1.  Remove Tek screws that may interfere with baseboard 

installation.

2.  Position baseboard as shown and clamp or hold in 

place.

3.  From inside the greenhouse, drill holes through ground 

posts, panels, and baseboard. (Ground posts may 

come pre-drilled.)

4.  Secure with 1/4" x 4" carriage bolts and nuts. Insert 

from outside.  

 

Depending on baseboard dimensions, countersink bolt 

holes in baseboard as needed to allow bolts to reach 

through all components. 

5.  Continue by sealing greenhouse using the supplied 

silicone sealant. See next page.

 

Содержание 106201

Страница 1: ...an All Rights Reserved Reproduction is prohibited without permission Photo may show a different but similar model GrowSpan Round Premium Greenhouses STK DIMENSIONS 106201 14 W x 8 3 H x 16 L 106202 14...

Страница 2: ...u determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or ancho...

Страница 3: ...ad the care and maintenance information in next column 14 Complete and return all warranty documents as instructed SHELTER CARE AND MAINTENANCE Proper care and maintenance of the shelter is important...

Страница 4: ...the front to the back of the frame This baseboard is not included with the shipment and must be supplied by the customer Treated or recycled plastic lumber works well for a baseboard The baseboard wh...

Страница 5: ...A4482B Tek Screw QH1400 Band Clamps 104074 Square to Round Tube Connect Bracket QH1330 Angle Bracket 102855 End Clamp 102479 Cross Connector QH1072 Post Driver 104548 End Cap Profile Doors Fans Vents...

Страница 6: ...th flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do not use shorter screws They will not hold Do not use washers on Tek screws when installing the 1132...

Страница 7: ...ing Frame Components See illustration below to identify main parts of greenhouse 1 Locate required parts for each assembly procedure 2 Assemble rafters and frame 3 Anchor frame 4 Assemble and install...

Страница 8: ...Repeat the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if needed before...

Страница 9: ...el surface 2 Slide three 3 end purlin clamps over the rafter pipes NOTE Consult the Front Profile diagram in the Quick Start section for proper end clamp placement and position 3 After slipping the cl...

Страница 10: ...connectors 102479 Purlin pipe 1 315 x 75 swaged 131S075 Purlin pipe 1 315 x XX plain 131P0XX 5 16 x 2 1 2 machine bolts and 5 16 nuts Tek screws FA4482B Marker and tape measure Lifts ladders and assi...

Страница 11: ...hten end clamp and secure it to rafter and purlin using an FA4482B Tek screw Do not allow purlin to extend beyond end rafter End Rafter Purlin End Rafter 10 Repeat Steps 5 9 to install first section o...

Страница 12: ...cure the joint Install a Tek screw if needed 19 Remove any temporary bracing if needed and anchor the frame ASSEMBLY NOTE Install Tek screws using a clutched drill driver running approximately 750 RPM...

Страница 13: ...ms in Quick Start section showing polycarbonate panel locations and locations of aluminum trim and profile before repositioning any end wall vertical DO NOT MOVE END WALL VERTICALS USED AT THE SEAM OF...

Страница 14: ...determined in Step 10 above and subtract the amount needed to account for the square to round tube connect bracket which attaches to top of jamb See diagram below Cut tube accordingly at swaged end t...

Страница 15: ...tube fitting 104624 to attach support to base tube Door Opening Angle Bracket Mark Step 6 Base Tube Center of Door Frame Tube 19 Repeat Steps 10 11 to cut each tube for the remaining vertical frame m...

Страница 16: ...base rail remove Tek screws and continue 2 With proper assistance lift door and position it in the opening 3 With door held in place swing loose door jamb back into position Secure jamb to base rail...

Страница 17: ...urn to each band clamp and pipe splice of base tubes and verify that a Tek screw is installed Install a Tek screw if needed 9 Continue by installing polycarbonate end wall panels 6 Place door header t...

Страница 18: ...dirt and damage Seal bottom edge of panels with white vent tape Top is sealed with foil tape after installation Consult polycarbonate panels Quick Start section for location and lengths of each panel...

Страница 19: ...s of H channel at panel bottom and cut a section of end cap profile 104548 to fit between H channel END PANEL INSTALLATION continued 11 Install end cap profile on bottom of small panel When installed...

Страница 20: ...dure will cover tops of all end panels See dashed line in previous diagram 16 Apply DH8007 foil tape to the tops of all end panels to seal all open cells before flashing installation See dashed line i...

Страница 21: ...nder of flashing face at 12 on center intervals ATTENTION To allow flashing to bend more easily decrease the on center spacing of cut lines Flashing Cut to Bend Bend in Flashing 12 4 Using tin snips c...

Страница 22: ...nued 9 Continue installing flashing and work down to ground ATTENTION Be mindful of where to cut last section of flashing as you near end of end rafter You may not need to cut every 12 to install fina...

Страница 23: ...two 2 bays as shown 2 Install upper panel for end bay Upper panel overlaps lower panel at least six 6 inches 3 Repeating Steps 1 2 work toward other end of frame until all panels are installed 4 Attac...

Страница 24: ...cted side and remove protective film NOTE Mark UV protected side using a piece of tape or other means to ensure side is installed toward the sun 2 Apply vent tape 104774 to cover one end of panel 3 Mo...

Страница 25: ...B Tek screws and 102921 neo bonded washers attach panel to rafters Use assistants and hand clamps as needed to hold panel tight to rafters as screws are installed Ensure panel remains square on frame...

Страница 26: ...nts or other reasons review the alternative installation steps in next column If you were able to install panels continue with Step 11 ALTERNATIVE INSTALLATION FOR ROOF PANELS During assembly sometime...

Страница 27: ...ection 2 shorter than panel length 116051 Upper Panel Cut to Fit End of Panel End of Panel 6 Overlap POLYCARBONATE ROOF PANELS continued 15 With assistant stationed inside and outside the frame carefu...

Страница 28: ...e panel is installed continue with next step 21 Take a 12 piece of H channel and cut it to fit upper panel Remember to cut H channel 2 shorter Step 14 to allow for U channel installation ATTENTION Do...

Страница 29: ...of installed upper panel c With someone pushing gently from side to keep panel in H channel have an assistant push panel up from bottom Lubricate the H channel and edge of panel with water if needed S...

Страница 30: ...top of all lower panels inside greenhouse 104213 U Channel Long Side of Profile 2 Move inside the frame and measure between rafters at point where upper and lower panels overlap 3 Cut a piece of 1047...

Страница 31: ...ecure overlap seam of all panels Install one tube per overlap as shown 7 Install an additional Tek screw and washer at end of H channel if needed to secure channel to rafter See photo in Step 5 8 Cont...

Страница 32: ...ound Level Outside of Shelter After installing all panels installing baseboards is strongly recommended Minimum size is 2 x 6 Length determined by building length Materials for baseboards are supplied...

Страница 33: ...ed 1 Open supplied sealant and apply a thin bead to the outside of upper panel to seal panel to U channel 2 Seal seams between all H channel and U channel sections 3 Apply a bead of sealant along bott...

Страница 34: ...GREENHOUSES 34 106201_02_03_04 Revision date 01 10 19 QUICK START GUIDE 14 Wide Round Premium Greenhouse Actual frame may differ in length from frame shown Ground Level 14 0 Width 8 3 Height Grid Repr...

Страница 35: ...UND PREMIUM GREENHOUSES Revision date 01 10 19 106201_02_03_04 FRONT PROFILE 14R1301D 14R1301D 14R1302 14R1303 102676 1 66 Ground Post 102676 1 66 Ground Post Purlin Connections Mid Rafter 102479 End...

Страница 36: ...MIUM GREENHOUSES 36 106201_02_03_04 Revision date 01 10 19 SIDE PROFILE 106201 Rafter Spacing On Center 4 0 16 0 Length Center to Center 131S075 131S075 131P0495 Purlin Run Baseboards Supplied by Cust...

Страница 37: ...IUM GREENHOUSES Revision date 01 10 19 106201_02_03_04 SIDE PROFILE 106202 131S075 131S075 131S075 131P0255 Purlin Run Rafter Spacing On Center 4 0 20 0 Length Center to Center Baseboards Supplied by...

Страница 38: ...GREENHOUSES 38 106201_02_03_04 Revision date 01 10 19 SIDE PROFILE 106203 Rafter Spacing On Center 4 0 24 0 Length Center to Center 131S075 131S075 131S075 131P0735 Purlin Run Baseboards Supplied by...

Страница 39: ...GREENHOUSES Revision date 01 10 19 106201_02_03_04 SIDE PROFILE 106204 131S075 131S075 Purlin Run 131S075 131S075 131P0495 4 0 On Center Rafter Spacing 28 0 Length Center to Center Baseboards Supplied...

Страница 40: ...evision date 01 10 19 CONNECTIONS Endwall Baserail Connection View 5 Vertical Horizontal Connection View 4 Endwall Rafter Connection View 3 Purlin End Rafter Connection View 2 Purlin Mid Rafter Connec...

Страница 41: ...rizontal Rail Endwall View 5 Endwall Baserail Connection View 4 Vertical Horizontal Connection View 3 Rafter Endwall Connection Endwall 104074 Sq Rnd Tube Bracket Rafter QH1400 1 315 Band Clamp View 2...

Страница 42: ...sion date 01 10 19 END FRAMING FRONT 81 7 8 INSIDE DIM 37 5 8 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FULL LE...

Страница 43: ...ate 01 10 19 106201_02_03_04 END FRAMING BACK 37 5 8 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FULL LENGTH OR C...

Страница 44: ...nd Level Width of Door Frame Height of Door Frame Use the dimensions of the accessory to set the distance between the upper and lower horizontal frame members Frame for Door Measure the door that ship...

Страница 45: ...th flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do not use shorter screws They will not hold Do not use washers on Tek screws when installing the 1132...

Страница 46: ...PANELS FRONT 4 X 8 POLY 6 X 10 POLY 6 X 10 POLY H CHANNEL U CHANNEL END CAP ABOVE DOOR ONLY NOTE INSTALL UV PROTECTED SIDE OF PANEL TO THE OUTSIDE ATTENTION Install all panels with UV protected side...

Страница 47: ...YCARBONATE PANELS BACK 4 X 10 POLY 6 X 10 POLY 6 X 10 POLY H CHANNEL NOTE INSTALL UV PROTECTED SIDE OF PANEL TO THE OUTSIDE 113236096 H Channel ATTENTION Install all panels with UV protected side towa...

Страница 48: ...ES 48 106201_02_03_04 Revision date 01 10 19 MAIN COVER DETAILS Ground Level 104213 R a f t e r H C h a n n e l P o l y c a r b P o l y c a r b 1 0 4 2 1 3 47 1 4 x 96 Panel 116049 47 1 4 x 96 Panel 1...

Страница 49: ...49 GROWSPAN ROUND PREMIUM GREENHOUSES Revision date 01 10 19 106201_02_03_04 Space below reserved for customer notes...

Отзывы: