OM/SM-BPM-E CE
Single Phase
1. Installation
WARNING
THE BRAISING PAN MUST BE INSTALLED BY
PERSONNEL WHO ARE QUALIFIED TO WORK
WITH ELECTRICITY. IMPROPER INSTALLATION
COULD RESULT IN PERSONAL INJURY OR
EQUIPMENT DAMAGE.
Internal wiring for the Braising Pan is supplied complete.
When you receive the unit, it is ready for connection. A
wiring schematic is located inside the control box on the
right side of the pan, and in this manual.
Your pan was performance tested at the factory to
confirm that all controls and heating elements were
functioning correctly.
IMPORTANT
These appliances must be installed by a competent
person in conformity with the installation and servicing
instructions and national regulations in force at the
time. Particular attention must be paid to the following:
I.E.E. Regulations and Electrical Installations
Electricity at Work Regulations
Health and Safety at Work Act
Fire Precautions Act
Local and National Building Regulations
1.1 Installation is as follows:
Provide the proper electrical supply as
specified on the electrical information plate.
Comply with local codes and the National
Electrical Code ANSI/NFPA 70 - latest
edition.
Use appropriate sized copper wire,
rated at least 90ºC (194ºF).
Units are wired at the factory for three
phase or single phase (per order) operation
and should be connected as shown
(See Fig. 1):
TERMINAL BLOCK
Set the unit in place and level it by turning the
adjustable feet. Crank the pan body to a
completely horizontal position. Check
levelness by placing a spirit level on the
bottom of the pan. The unit must be level to
avoid uneven cooking across the pan.
Make a
water tight
connection with the
incoming power line at the electrical service
entrance at the back of the control box. A BX
connection is
NOT
recommended.
ELECTRICALLY
GROUND THE UNIT
at the proper terminal.
WARNING
ELECTRICALLY GROUND THE BRAISING PAN
AT THE TERMINAL PROVIDED.
Three Phase
1.1.1
1.1.2
1.1.3
Fig. 1
Terminal Block
1.1.4
1.1.6
Conduit entry is at the control box on the rear left
side of the appliance. Access to the terminals is
gained by removing the terminal block cover
shown in figure 2.
1.1.5
Fig. 2
1.2. Water Supply
- Not applicable to this appliance
except for optional faucets.
Terminal
Block
Cover
Conduit Entry Opening