0
OM/SM-BPM-E CE
6. Maintenance
Your Braising Pan is designed to require minimum
maintenance, but certain parts may need
replacement after prolonged use. After installation,
no user adjustment should be necessary. If a
service need arises, only authorized personnel
should perform the work.
WARNING
ELECTRIC POWER ALWAYS SHOULD BE
SHUT OFF BEFORE WORK IS DONE ON
INTERNAL COMPONENTS
Service personnel should check the unit at least
once a year. This periodic maintenance should
include inspecting wires and connections and
cleaning inside the control console. At least twice a
year grease the two trunnion bearings and worm
gear.
Groen recommends the use of number two grade
LGI lithium grease. Add grease through the zerk
fittings on the gear hosing until grease flows out of
the bearings around trunion shaft. Also, add grease
in the gear to cover arc that is in contact with the
worm gear. Clean up excess grease.
WARNING
DISCONNECT ELECTRICAL POWER
FROM THE UNIT BEFORE ATTEMPTING
TO GREASE THE TRUNNION SHAFT.
A Service Log is provided with the warranty
information at the back of this manual. Each time
service is performed on your Groen equipment, enter
the date on which the work was done, what was
done, and who did it. Keep the manual with the
equipment for quick and easy reference.
WARNING
ELECTRICAL POWER MUST BE SHUT OFF BEFORE WORK IS DONE ON INTERNAL COMPONENTS.
WARNING
USE OF ANY REPLACEMENT PARTS OTHER THAN THOSE SUPPLIED BY GROEN OR THEIR
AUTHORIZED DISTRIBUTORS CAN CAUSE INJURY TO THE OPERATOR AND DAMAGE TO THE
EQUIPMENT AND WILL VOID ALL WARRANTIES.
SERVICE PERFORMED BY OTHER THAN FACTORY-AUTHORIZED PERSONNEL WILL VOID ALL
WARRANTIES.