OM-NGB/3       7

Installation

b.  

Copies of the electrical schematic are located in the electrical enclosure 

on the equipment and in this manual. In Canada, electrical service must 

comply with the Canadian Electrical Code, CSA C22.1, Part 1, and/or 

local codes.

3.   Water Connection 

a. 

Cold water is supplied via a 1/2” NPT pipe connection at the rear of the 

unit. A check valve (back siphonage device) must be installed in accord 

with local plumbing codes.

b. 

Water pressure should be between 30 and 60 PSI. If it is over 60 PSI, 

a pressure regulator is required. A strainer screen at the connection is 

also recommended, to trap any debris before it can enter the system.

c. 

The boiler uses a maximum of 12.9 gallons of water per hour. Piping 

should be sized to handle total water consumption.

4.   Drain Connection

a. 

The drain connection is made at the rear of the unit with 1 - 1/4” NPT 

pipe. DO NOT USE PLASTIC PIPE. DRAIN PIPING MUST WITHSTAND 

STEAM AND BOILING WATER. Extend the drain piping to a nearby 

floor drain. Piping of 1 - 1/4” NPT (or 1 - 1/2” NPT) is acceptable for 

distances of six feet or less. If the distance to the drain is further than 

six feet, use 2” NPT piping.

b. 

The drain line must be installed with a constant downward pitch. Do 

not permit any water traps in the line. DO NOT CONNECT THE LINE 

DIRECTLY TO ANY BUILDING DRAIN. A vertical air gap of at least two 

inches must be maintained between the drain line and the building drain 

unless otherwise specified by local plumbing codes.

CAUTION 

DO NOT LOCATE THE BOILER CABINET

DIRECTLY OVER A FLOOR DRAIN OR FLOOR 

SINK. HUMIDITY OR WATER FROM WILL 

DAMAGE ELECTRICAL.

IMPORTANT

IMPROPER DRAIN CONNECTION 

WILL VOID WARRANTY.

Leave a two-inch air gap between the 

hose and the building drain, and don’t 

allow water traps in the line.

Содержание CNGB/3-24

Страница 1: ...ustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing or servicing this equipmen...

Страница 2: ...MANUFACTURER WARNING DO NOT MIX DE LIMING AGENTS ACID AND DE GREASERS ALKALI IN THE STEAM GENERATOR OR ON THE COOKING CHAMBER WALLS NOTICE Do not use a cleaning or de liming agent that contains any S...

Страница 3: ...0 NATIONAL FIRE PROTECTION ASSOCIATION 60 Batterymarch Park Quincy Massachusetts 02269 NFPA 70 The National Electrical Code NFPA 54 Installation of Gas Appliances Piping NFPA 96 Ventilating Hoods NSF...

Страница 4: ...The boiler is constructed of 1 4 thick steel which is certified by the American Society of Mechanical Engineers ASME for pressure vessels All welds are hydrostatically tested The boiler is also equip...

Страница 5: ...0 to 60 ppm Chlorine and Chloramine less than 0 1 ppm Total Chloride less than 30 ppm Silica less than 12 ppm Undissolved Solids less than 5 microns 1 Do not rely on unproven water treatments which ar...

Страница 6: ...system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 PSI 3 45 kPA 1 Gas Supply Connection a Co...

Страница 7: ...Connection a The drain connection is made at the rear of the unit with 1 1 4 NPT pipe DO NOT USE PLASTIC PIPE DRAIN PIPING MUST WITHSTAND STEAM AND BOILING WATER Extend the drain piping to a nearby fl...

Страница 8: ...repeat the trial for ignition 5 Turn the on off switch on the cabinet front panel to the ON position The amber light in the switch will come on The boiler drain valve will close The unit will fill wit...

Страница 9: ...ically stop the gas flow and terminate the ignition trial If ignition is terminated turn the switch off and then ON again to repeat the trial Normally the pilot should light within five seconds of tur...

Страница 10: ...nce the pressure has reached 9 1 2 PSI the main burner will be shut off by an operating pressure switch Residual heat stored in the boiler s heat exchanger can however cause the pressure to continue t...

Страница 11: ...under the boiler 3 Close the manual drain valve 4 Turn off water supply to the boiler 5 Allow the boiler to cool This takes several hours so it is recommended that you cool the boiler overnight 6 Tur...

Страница 12: ...r doors 19 Turn the on off switch OFF and slowly open the manual drain valve 20 When the boiler has drained completely close the manual drain valve and turn the on off switch to ON to fill the boiler...

Страница 13: ...hnician a weekly check of the following will help prevent down time and ensure continued efficient operation 1 Pressure gauge operation 2 Proper water level gauge 3 Strainer in water feed line clear 4...

Страница 14: ...reater than 60 PSI Authorized Service Rep Only c Is the Water Level Control Board defective Check for loose electrical connections on hi water fill solenoid X d Is the water fill solenoid valve defect...

Страница 15: ...uilds pressure but shuts down RESET light comes on User a Is the water level below the mid water level probe Verify that the water supply is sufficient to maintain the water level at or above the mid...

Страница 16: ...7a Main Burner Assy 0 2000 Ft Elev Incl 29 Gas Jets W 54 Drill Dia Hole For Natural Gas 047267 7a Main Burner Assy 0 2000 Ft Elev Incl 29 Gas Jets W 68 Drill Dia Hole For Propane Gas 050491 8 Gas Val...

Страница 17: ...ressure Relief Valve 12PSI 099228 7 Water Level Probes lo med hi 076526 8 Solenoid Valve Water in 099220 9 Check Valve 004187 10 Air Vent 145167 11 Vacuum Breaker 090787 12 Globe Valve 1 2 NPT 099255...

Страница 18: ...nal Block 2 Pole 003887 Bushing Snap 11 16 ID 012864 7 Circuit Board Support 099292 8 Water Level Control Board Assembly 116016 9 Lug Ground 14 6 AWG 119829 10 Circuit Breaker 119860 11 Transformer 75...

Страница 19: ...ED 11 WHITE P1 J1 1 TSTAT DRAIN VALVE 1 2 2 T1 LO 14 5 PSI OPERATING PRESSURE GAS VALVE 7 YELLOW 8 BLACK C HL 12 BLACK 10 BLACK 9 RED C PS SW H C G BLACK YELLOW BLUE WHITE 4 BLACK 6 BROWN 5 BLUE 3 BRO...

Страница 20: ...20 OM NGB 3 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 21: ...OM NGB 3 21 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 22: ...22 OM NGB 3 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 23: ...OM NGB 3 23 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 24: ...REV D 07 14 1055 Mendell Davis Drive Jackson MS 39272 888 994 7636 601 372 3903 Fax 888 864 7636 unifiedbrands net 2014 Unified Brands All Rights Reserved Unified Brands is a wholly owned subsidiary o...

Отзывы: