WHEN THE UNIT IS RECEIVED, IMMEDIATELY INSPECT IT FOR EXTERNAL OR INTERNAL 

DAMAGE. REPORT ANY DAMAGE TO THE FREIGHT CARRIER.

After inspection, keep the unit in its shipping container until it is installed. It can be 

installed on combustible and non-combustible floors. Minimum clearances are:

 

Right Side  

2 inches

 

Left Side  

4 inches

 

Rear    

6 inches

In order to service the unit properly, access with at least 24 inches clearance is 

needed on the right side.

Install the unit in a well-vented room so that there is an adequate air supply. Since 

products of combustion come out of its flue, the appliance must be located under a 

ventilation hood. 

Do not directly vent the flue.

Level the unit front to rear and left to right by adjusting its legs. Levelness may be 

checked by using a spirit level on top of the cabinet.

A free flow of air around the boiler promotes efficient operation. Items which might 

restrict air flow must be removed. After installation, do not obstruct the flue, or any 

front, side, rear or top vents. Similarly, keep the area directly around the appliance 

clear of combustible material.

Installation must conform with local codes, or in the absence of local codes, with the 

National Fuel Gas Code, ANSI Z223.1 (latest edition, including the following paragraph:

“The unit and its individual shut-off valve must be 

disconnected

 from the gas supply 

piping system during any pressure testing of that system at test pressures in excess 

of 1⁄2 PSI (3.45 kPA). The unit must be 

isolated

 from the gas piping system by closing 

its individual manual shut-off valve during any pressure testing of the gas supply 

piping system at test pressures 

equal to or less than

 

1⁄2 PSI (3.45 kPA).”

1.   Gas Supply Connection

a. 

Connection to the gas supply can be completed with 1/2” NPT pipe 

or approved equivalent. Although this is the diameter for immediate 

connection to the unit, 

gas supply piping must be large enough to 

provide volumes and pressure sufficient for 200,000 BTU per hour.

 

Supply pressure must be at least 5.0” W.C. (14.0” W.C. maximum) for 

natural gas or 11.0 W.C. (14.0” W.C. maximum) for propane.

 

b. 

In Canada, the installation must conform to the Canada Gas Code, CAN 

1-B149 (Installation Codes for Gas Burning Appliances and Equipment), 

and/or local codes.

c. 

After the unit has been connected to the gas supply, check piping joints 

for leaks. Do NOT use flame to check for leaks. A thick soap solution or 

other suitable leak detector should be used.

2.   Electrical Supply Connection 

a. 

The maximum electrical load is 4 AMP. You must provide 115 Volt 

Alternating Current, 60 Hz, 1PH, 15 AMP service. Local codes and/or the 

National Electrical Code should be followed (ANSI/NFPA-70-1987 - or 

latest edition). 

AN ELECTRICAL GROUND IS REQUIRED.

WARNING

MAKING ANY ELECTRICAL OR MECHANICAL 

CHANGE IN THE UNIT WITHOUT PRIOR 

GROEN APPROVAL WILL VOID ALL 

WARRANTIES.

Installation

WARNING

THE UNIT MUST BE INSTALLED BY 

PERSONNEL WHO ARE QUALIFIED TO WORK 

WITH GAS, ELECTRICITY AND PLUMBING.  

IMPROPER INSTALLATION CAN CAUSE 

INJURY TO PERSONNEL AND/OR DAMAGE 

TO THE EQUIPMENT.  THE UNIT MUST 

BE INSTALLED IN ACCORDANCE WITH 

APPLICABLE CODES.  THE UNIT MUST BE 

INSTALLED BY A LICENSED PLUMBER OR 

GAS FITTER WHEN INSTALLED WITHIN THE 

COMMONWEALTH OF MASSACHUSETTS.

Содержание CNGB/3-24

Страница 1: ...ustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing or servicing this equipmen...

Страница 2: ...MANUFACTURER WARNING DO NOT MIX DE LIMING AGENTS ACID AND DE GREASERS ALKALI IN THE STEAM GENERATOR OR ON THE COOKING CHAMBER WALLS NOTICE Do not use a cleaning or de liming agent that contains any S...

Страница 3: ...0 NATIONAL FIRE PROTECTION ASSOCIATION 60 Batterymarch Park Quincy Massachusetts 02269 NFPA 70 The National Electrical Code NFPA 54 Installation of Gas Appliances Piping NFPA 96 Ventilating Hoods NSF...

Страница 4: ...The boiler is constructed of 1 4 thick steel which is certified by the American Society of Mechanical Engineers ASME for pressure vessels All welds are hydrostatically tested The boiler is also equip...

Страница 5: ...0 to 60 ppm Chlorine and Chloramine less than 0 1 ppm Total Chloride less than 30 ppm Silica less than 12 ppm Undissolved Solids less than 5 microns 1 Do not rely on unproven water treatments which ar...

Страница 6: ...system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 PSI 3 45 kPA 1 Gas Supply Connection a Co...

Страница 7: ...Connection a The drain connection is made at the rear of the unit with 1 1 4 NPT pipe DO NOT USE PLASTIC PIPE DRAIN PIPING MUST WITHSTAND STEAM AND BOILING WATER Extend the drain piping to a nearby fl...

Страница 8: ...repeat the trial for ignition 5 Turn the on off switch on the cabinet front panel to the ON position The amber light in the switch will come on The boiler drain valve will close The unit will fill wit...

Страница 9: ...ically stop the gas flow and terminate the ignition trial If ignition is terminated turn the switch off and then ON again to repeat the trial Normally the pilot should light within five seconds of tur...

Страница 10: ...nce the pressure has reached 9 1 2 PSI the main burner will be shut off by an operating pressure switch Residual heat stored in the boiler s heat exchanger can however cause the pressure to continue t...

Страница 11: ...under the boiler 3 Close the manual drain valve 4 Turn off water supply to the boiler 5 Allow the boiler to cool This takes several hours so it is recommended that you cool the boiler overnight 6 Tur...

Страница 12: ...r doors 19 Turn the on off switch OFF and slowly open the manual drain valve 20 When the boiler has drained completely close the manual drain valve and turn the on off switch to ON to fill the boiler...

Страница 13: ...hnician a weekly check of the following will help prevent down time and ensure continued efficient operation 1 Pressure gauge operation 2 Proper water level gauge 3 Strainer in water feed line clear 4...

Страница 14: ...reater than 60 PSI Authorized Service Rep Only c Is the Water Level Control Board defective Check for loose electrical connections on hi water fill solenoid X d Is the water fill solenoid valve defect...

Страница 15: ...uilds pressure but shuts down RESET light comes on User a Is the water level below the mid water level probe Verify that the water supply is sufficient to maintain the water level at or above the mid...

Страница 16: ...7a Main Burner Assy 0 2000 Ft Elev Incl 29 Gas Jets W 54 Drill Dia Hole For Natural Gas 047267 7a Main Burner Assy 0 2000 Ft Elev Incl 29 Gas Jets W 68 Drill Dia Hole For Propane Gas 050491 8 Gas Val...

Страница 17: ...ressure Relief Valve 12PSI 099228 7 Water Level Probes lo med hi 076526 8 Solenoid Valve Water in 099220 9 Check Valve 004187 10 Air Vent 145167 11 Vacuum Breaker 090787 12 Globe Valve 1 2 NPT 099255...

Страница 18: ...nal Block 2 Pole 003887 Bushing Snap 11 16 ID 012864 7 Circuit Board Support 099292 8 Water Level Control Board Assembly 116016 9 Lug Ground 14 6 AWG 119829 10 Circuit Breaker 119860 11 Transformer 75...

Страница 19: ...ED 11 WHITE P1 J1 1 TSTAT DRAIN VALVE 1 2 2 T1 LO 14 5 PSI OPERATING PRESSURE GAS VALVE 7 YELLOW 8 BLACK C HL 12 BLACK 10 BLACK 9 RED C PS SW H C G BLACK YELLOW BLUE WHITE 4 BLACK 6 BROWN 5 BLUE 3 BRO...

Страница 20: ...20 OM NGB 3 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 21: ...OM NGB 3 21 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 22: ...22 OM NGB 3 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 23: ...OM NGB 3 23 Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Страница 24: ...REV D 07 14 1055 Mendell Davis Drive Jackson MS 39272 888 994 7636 601 372 3903 Fax 888 864 7636 unifiedbrands net 2014 Unified Brands All Rights Reserved Unified Brands is a wholly owned subsidiary o...

Отзывы: