10 OM-AH/1
After kettle has been installed, the installer should test to ensure that it is operating
correctly.
. DIRECT SKIN CONTACT
1. Remove all literature and packing materials from inside and outside of the unit.
2. Install the TDO valve.
3. Put a small amount of water into the kettle.
4. Verify that kettle water level is normal and that kettle is holding vacuum in
jacket. Correct if not.
5. Make sure the supplies of gas and electric power are on.
6. Follow the “Start Kettle Heating” instructions in the Operation section of this
manual. Begin heating the water at the highest thermostat setting. The indicator
light should come on and heating should continue until the water boils.
7. To turn off the unit, follow “To Stop Kettle Heating” in the Operation section.
If the kettle functions as described, if is read for use. If the unit does not operate as
designed, contact authorized Service Agent.
Initial Start-Up
IMPORTANT
BE SURE ALL OPERATORS READ,
UNDERSTAND AND FOLLOW THE
OPERATING INSTRUCTIONS, CAUTIONS
AND SAFETY INSTRUCTIONS CONTAINED
IN THIS MANUAL.
WARNING
AVOID ALL DIRECT CONTACT WITH HOT
SURFACES. DIRECT SKIN CONTACT COULD
RESULT IN SEVERE BURNS.
AVOID ALL DIRECT CONTACT WITH HOT
FOOD OR WATER IN THE KETTLE. DIRECT
CONTACT COULD RESULT IN SEVERE
BURNS.
Содержание AH/1E Domestic
Страница 25: ...OM AH 1 25 Parts List...
Страница 26: ...26 OM AH 1 Parts List AH 20 40 GAS PIPING TO BURNER AH 60 80 100 GAS PIPING TO BURNER...
Страница 28: ...28 OM AH 1 Electrical Schematic...
Страница 31: ...OM AH 1 31...