Model G0850 (Mfd. Since 01/19)
-21-
Figure 31. Collection drum lids secured to
cyclone funnels.
29. Repeat Steps 27–28 for left cyclone funnel
and install with vertical seam and vacuum
port facing rear of machine.
30. Place gasket on one collection drum lid, then
loosely attach to cyclone funnel using (6)
5
⁄
16
"-
18 x
3
⁄
4
" hex bolts and (6)
5
⁄
16
" fender washers
(see
Figure 31). Repeat for second lid.
32. Using a cross pattern, final tighten all hex
nuts and hex bolts used in
Steps 26–31 to
secure cyclone funnels, intake barrels, impel-
ler housing, and collection drum lids.
33. Attach (1) E-clip to each headless clevis pin.
34. Align holes in each collection drum lock
handle with holes in legs.
31. Attach each collection drum lid to lower legs
using (4)
5
⁄
16
"-18 x
3
⁄
4
" hex bolts and (4)
5
⁄
16
"
fender washers (see
Figure 32).
Figure 32. Collection drum lids secured to legs.
x 8
35. Place one pin through holes, then attach sec-
ond E-clip to each clevis pin to secure drum
lock handle to legs (see
Figure 33). Repeat
for second drum lock handle.
Figure 34. Inner filter muffler with (6) knob bolts
attached to impeller housing.
x 3
x 3
x 3
36. With help from an assistant, attach inner filter
muffler to impeller housing using (3)
5
⁄
16
"-18 x
3
⁄
4
" hex bolts and (3)
5
⁄
16
" fender washers (see
Figure 34).
Figure 33. Collection drum lock handle attached
to lower legs with clevis pins.
x 2
37. Loosely thread (6)
1
⁄
4
"-20 x 1" 6-lobe knob
bolts into outside of muffler.
Collection Drum
Lock Handle
x 12
Clevis Pin
Содержание G0850
Страница 56: ......