GRIDSTORE ADMINISTRATOR’S GUIDE 7
Setting Up the Grid
In this section, you will set up a Grid—which consists of at least three Gridstore Storage Nodes—in
just three easy steps.
This section covers the following topics:
Step 1: Set Up Gridstore Storage Nodes
Step 2: Install Gridstore Software
Step 3: Configure Gridstore Storage Nodes
Next Steps
Note:
If you are adding Gridstore Storage Nodes to an existing Grid, see
on pg. 105 instead.
Step 1: Set Up Gridstore Storage Nodes
In this first step, you will rack mount, connect and power on the Gridstore Storage Nodes for your
Grid. Note that each Gridstore Storage Node comes ready to rack mount.
Note:
You need at least three Gridstore Storage Nodes in a Grid.
As you follow the steps, refer to the images below.
Содержание GS-1000-2
Страница 1: ...Gridstore Administrator s guide ...
Страница 2: ......
Страница 66: ...GRIDSTORE ADMINISTRATOR S GUIDE 65 The Add Clients Wizard opens 2 Click the Next button ...
Страница 120: ...GRIDSTORE ADMINISTRATOR S GUIDE 119 A table of Gridstore Storage Node statistics displays to the right ...