Page 15
SKU 65162
For technical questions, please call 1-800-444-3353.
After the engine starts and warms
5.
up, slowly move the choke lever to its
“RUN” position.
IMPORTANT: Allow the engine to
6.
run at no load for five minutes with no
load after each start-up so that the
engine can stabilize.
Break-in Period
Breaking-in the engine will help to
1.
ensure proper equipment and engine
operation.
The operational break-in period will
2.
last about 3 hours of use. During this
period:
Do not apply a heavy load to the
•
equipment.
Do not operate the engine at its
•
maximum speed.
The maintenance break-in period will
3.
last about 20 hours of use. After this
period:
Change the engine oil.
•
Under normal operating conditions
subsequent maintenance follows
the schedule explained in the
MAINTENANCE AND SERVICING
section.
equipment operation
This Trencher can be used with two
1.
arm positions. See illustrations to the
right.
cylinder (26)
Pin
Main
Boom
(36)
Boom
Pivot
(38)
cylinder (26)
Pin
Boom
Pivot
(38)
Main
Boom
(36)
REV 09f